共 11 条
- [1] Baker A.D., 1996, Metaphor or Reality: A Case Study Where Agents Bid with Actual Costs to Schedule a Factory, P184
- [2] BAKER AD, J MANUFACTURING SYST, V17, P297
- [3] BROOKS RA, 1986, IEEE J ROBUST AUTOMA, V2
- [4] Goldratt E.M., 1990, THEORY CONSTRAINTS
- [5] GREENE TJ, 1987, PRODUCTION INVENTORY
- [7] PARUNAK HVD, 1365, INTELLIGENT AGENTS 4, P45
- [8] PARUNAK HVD, 1997, P 1 INT C AUT AG ICA
- [9] PARUNAK HVD, UNPUB INTERGRATED CO
- [10] RING J, 1999, CURRENT ENTERPRISE M