Robust Task Scheduling of Multi-Satellite Parallel Test
被引:0
|
作者:
Lin Shumin
论文数: 0引用数: 0
h-index: 0
机构:
Beihang Univ, Dept Automat Control, Beijing 100191, Peoples R ChinaBeihang Univ, Dept Automat Control, Beijing 100191, Peoples R China
Lin Shumin
[1
]
Zheng Zheng
论文数: 0引用数: 0
h-index: 0
机构:
Beihang Univ, Dept Automat Control, Beijing 100191, Peoples R ChinaBeihang Univ, Dept Automat Control, Beijing 100191, Peoples R China
Zheng Zheng
[1
]
Cai Kai-Yuan
论文数: 0引用数: 0
h-index: 0
机构:
Beihang Univ, Dept Automat Control, Beijing 100191, Peoples R ChinaBeihang Univ, Dept Automat Control, Beijing 100191, Peoples R China
Cai Kai-Yuan
[1
]
机构:
[1] Beihang Univ, Dept Automat Control, Beijing 100191, Peoples R China
来源:
2011 30TH CHINESE CONTROL CONFERENCE (CCC)
|
2011年
关键词:
Parallel Test;
Task Scheduling;
Robustness;
D O I:
暂无
中图分类号:
TP [自动化技术、计算机技术];
学科分类号:
0812 ;
摘要:
This paper mainly deals with task scheduling of multi-satellite parallel test with priority under uncertainty. The robustness of the schedule is so important that it must be considered to avoid delay. On the base of the definition of two robustness measures of a schedule, the problem is formulated into a bi-objective model with objectives of makespan minimization and robustness maximization. Furthermore, an algorithm for robust task scheduling of multi-satellite parallel test is proposed to solve the bi-objective model. The experiment justifies the effectiveness and efficiency of our model and algorithm to solve this problem.