Bridging BIM and building (BBB) for information management in construction The underlying mechanism and implementation

被引:29
作者
Chen, Ke [1 ]
Lu, Weisheng [2 ]
机构
[1] Huazhong Univ Sci & Technol, Dept Construct Management, Wuhan, Hubei, Peoples R China
[2] Univ Hong Kong, Dept Real Estate & Construct, Hong Kong, Peoples R China
关键词
Information systems; Building information modelling; Information and communication technology (ICT) applications; SIMULATION; SYSTEM;
D O I
10.1108/ECAM-05-2018-0206
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose How to make an effective use of building information modeling (BIM) for information management (IM) is a challenging question in the field of construction project and asset management. Chen et al. (2015) answered this question by developing a conceptual framework of "bridging BIM and building (BBB)." However, the underlying mechanism through which BBB can truly impact IM remains unclear. The purpose of this paper is thus to demystify the mechanism linking BBB and IM. Design/methodology/approach Drawing upon the IM literature, this paper proposes three IM requirements, namely, requirements on information quantity, quality and accessibility, as the significant mediators between BBB and IM. To verify this proposition, a two-year, participatory case study was conducted based on a real-life construction project in which a BBB system was implemented. Findings The results of the case study supported the proposition that by enhancing the information quantity, quality and accessibility BBB could favorably contribute to IM in construction. Originality/value This study is among the first attempts to streamline the theoretical discourses relating to BBB for IM in a construction context. It contributes to the construction IM by directing attention to key IM requirements and processes rooted in the IM literature.
引用
收藏
页码:1518 / 1532
页数:15
相关论文
共 37 条
  • [1] Recent paradigms for risk informed decision making
    Amendola, A
    [J]. SAFETY SCIENCE, 2002, 40 (1-4) : 17 - 30
  • [2] [Anonymous], 2008, BOOK BIM HDB GUIDE B
  • [3] Anumba ChimayJ., 2010, CONSTRUCTION RES C 2, P528, DOI DOI 10.1061/41109(373)53
  • [4] How to measure the benefits of BIM - A case study approach
    Barlish, Kristen
    Sullivan, Kenneth
    [J]. AUTOMATION IN CONSTRUCTION, 2012, 24 : 149 - 159
  • [5] Management of Collaborative BIM Data by Federating Distributed BIM Models
    Beach, Thomas
    Petri, Ioan
    Rezgui, Yacine
    Rana, Omer
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (04)
  • [6] A web-based system for managing construction information
    Chassiakos, A. P.
    Sakellaropoulos, S. P.
    [J]. ADVANCES IN ENGINEERING SOFTWARE, 2008, 39 (11) : 865 - 876
  • [7] Naming Objects in BIM: A Convention and a Semiautomatic Approach
    Chen, Ke
    Lu, Weisheng
    Wang, Hongdi
    Niu, Yuhan
    Huang, George G.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (07)
  • [8] Bridging BIM and building: From a literature review to an integrated conceptual framework
    Chen, Ke
    Lu, Weisheng
    Peng, Yi
    Rowlinson, Steve
    Huang, George Q.
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2015, 33 (06) : 1405 - 1416
  • [9] Choo ChunWei., 2002, Information Management for the Intelligent Organization: the Art of Scanning the Environment
  • [10] ORGANIZATIONAL INFORMATION REQUIREMENTS, MEDIA RICHNESS AND STRUCTURAL DESIGN
    DAFT, RL
    LENGEL, RH
    [J]. MANAGEMENT SCIENCE, 1986, 32 (05) : 554 - 571