Utilization of pneumatic flow tube mixing technique (PFTM) for processing and stabilization of contaminated soft sediments in the NY/NJ Harbor

被引:4
作者
Maher, Ali [1 ]
Kitazume, Masaki [2 ]
Janbaz, Masoud [1 ]
Miskewitz, Robert [1 ]
Douglas, Scott [3 ]
Yang, David [4 ]
机构
[1] Rutgers State Univ, Civil & Environm Engn, 100 Brett Rd, Piscataway, NJ 08854 USA
[2] Tokyo Inst Technol, Dept Civil Engn, Tokyo, Japan
[3] NJ Dept Transportat, Off Maritime Resources, Trenton, NJ USA
[4] JAFEC Grp, Deep Fdn Inst Dept, San Jose, CA USA
关键词
Ground improvement; pneumatic flow tube mixing; soft sediment;
D O I
10.1080/1064119X.2016.1257668
中图分类号
P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
A pilot study was conducted to evaluate the use of the pneumatic flow tube mixing method for stabilization and solidification of soft sediments dredged from the New York/New Jersey Harbor. The study included a comprehensive laboratory investigation aimed at determining the ideal mix for pneumatic flow tube mixing stabilization, and a pilot-scale demonstration of the pneumatic flow tube mixing technique in the field. Material stabilized during the demonstration was analyzed through unconfined compression tests, needle tests, laboratory vane shear tests, and flow tests in the laboratory and the cone penetration test in the field. Curing times for the samples were 3, 7, 14, and 28 days. The three cement content mixes were 4, 8, and 12% by weight (wet weight). Pneumatic flow tube mixing was demonstrated to be an efficient and rapid method for soft sediment stabilization with the resulting material showing uniform quality of mix meeting, New Jersey Department of Environmental Protection's geotechnical and environmental fill placement criteria.
引用
收藏
页码:271 / 279
页数:9
相关论文
共 11 条
[1]  
Coastal Development Institute of Technology, 2008, TECHN MAN PNEUM FLOW, P187
[2]  
DOUGLAS WS, 2003, J DREDGING ENG, V5, P1
[3]   Quality control in Central Japan International Airport construction [J].
Kitazume, M. ;
Satohy, T. .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GROUND IMPROVEMENT, 2005, 9 (02) :59-66
[4]  
Kitazume M, 2003, GROUND IMPROVEMENT, V7, P139, DOI DOI 10.1680/GRIM.2003.7.3.139
[5]   Field placement and evaluation of stabilized dredged material (SDM) from the New York New Jersey Harbor [J].
Maher, A. ;
Douglas, W. S. ;
Jafari, F. .
MARINE GEORESOURCES & GEOTECHNOLOGY, 2006, 24 (04) :251-263
[6]  
Maher A., 2013, 193RU2763 RUTG CTR A
[7]  
Ministry of Transport The Fifth District Port Construction Bureaus, 1999, 5 DISTR PORT CONSTR, P157
[8]  
Mizukami J., 2015, P 15 AS REG C SOIL M
[9]  
New Jersey Department of Environmental Protection, 2013, DEV SIT SPEC IMP GRO
[10]  
New Jersey Department of Environmental Protection, 1997, DREDG TECHN MAN MAN