Evaluating stakeholder satisfaction during public participation in major infrastructure and construction projects: A fuzzy approach

被引:161
作者
Li, Terry H. Y. [1 ]
Ng, S. Thomas [1 ]
Skitmore, Martin [2 ]
机构
[1] Univ Hong Kong, Dept Civil Engn, Pokfulam, Hong Kong, Peoples R China
[2] Queensland Univ Technol, Sch Civil Engn & Built Environm, Brisbane, Qld 4001, Australia
关键词
Decision making; Participation; Effectiveness; Satisfaction; Evaluation; Fuzzy mathematics; CONCEPTUAL-FRAMEWORK; CLIENT-SATISFACTION; ENGAGEMENT PROGRAM; CONFLICT-ANALYSIS; MANAGEMENT; CHINA; MODEL; EIA;
D O I
10.1016/j.autcon.2012.09.007
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Numerous different and sometimes discrepant interests can be affected, both positively and negatively, throughout the course of a major infrastructure and construction (MIC) project. Failing to address and meet the concerns and expectations of the stakeholders involved has resulted in many project failures. One way to address this issue is through a participatory approach to project decision making. Whether the participation mechanism is effective or not depends largely on the client/owner. This paper provides a means of systematically evaluating the effectiveness of the public participation exercise, or even the whole project, through the measurement of stakeholder satisfaction. Since the process of satisfaction measurement is complicated and uncertain, requiring approximate reasoning involving human intuition, a fuzzy approach is adopted. From this, a multi-factor hierarchical fuzzy comprehensive evaluation model is established to facilitate the evaluation of satisfaction in both single stakeholder group and overall MIC project stakeholders. (C) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:123 / 135
页数:13
相关论文
共 76 条
[61]   Social impact assessment and public participation in China: A case study of land requisition in Guangzhou [J].
Tang, Bo-sin ;
Wong, Siu-wai ;
Lau, Milton Chi-hong .
ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2008, 28 (01) :57-72
[62]   Achieving client satisfaction for engineering consulting firms [J].
Tang, SL ;
Lu, M ;
Chan, YL .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2003, 19 (04) :166-172
[63]  
Urban Renewal Authority, 2001, URB REN STRAT
[64]  
Wang R.C., 2004, Constr. Manage. Econom, V22, P1047
[65]  
[汪文雄 WANG Wenxiong], 2007, [重庆建筑大学学报, Journal of Chongqing Jianzhu University], V29, P125
[66]   Fuzzy comprehensive evaluation of district heating systems [J].
Wei, Bing ;
Wang, Song-Ling ;
Li, Li .
ENERGY POLICY, 2010, 38 (10) :5947-5955
[67]  
West Kowloon Cultural District Authority, 2010, REP AN VIEWS STAG 1
[68]   The relationships between key stakeholders' project performance and project success: Perceptions of Chinese construction supervising engineers [J].
Wang, Xiaojin ;
Huang, Jing .
International Journal of Project Management, 2006, 24 (03) :253-260
[69]   Developing a risk assessment model for PPP projects in China - A fuzzy synthetic evaluation approach [J].
Xu, Yelin ;
Yeung, John F. Y. ;
Chan, Albert P. C. ;
Chan, Daniel W. M. ;
Wang, Shou Qing ;
Ke, Yongjian .
AUTOMATION IN CONSTRUCTION, 2010, 19 (07) :929-943
[70]   The association among project manager's leadership style, teamwork and project success [J].
Yang, Li-Ren ;
Huang, Chung-Fah ;
Wu, Kun-Shan .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2011, 29 (03) :258-267