When to integrate strategic and tactical decisions? Introduction of an asset/inventory ratio guiding fit for purpose production planning

被引:11
作者
Asmussen, Jesper Normann [1 ]
Kristensen, Jesper [1 ]
Steger-Jensen, Kenn [2 ,3 ]
Waehrens, Brian Vejrum [1 ]
机构
[1] Aalborg Univ, Ctr Ind Prod, Dept Mat & Prod, Aalborg, Denmark
[2] Aalborg Univ, Ctr Logist CELOG, Dept Mat & Prod, Aalborg, Denmark
[3] Univ Coll Southeast Norway, Dept Maritime Operat, Borre Horten, Norway
关键词
Strategic planning; Action research; Advanced planning and scheduling; Hierarchical planning; Monolithic planning; Tactical planning; SUPPLY CHAIN; MANUFACTURING SYSTEMS; CAPACITY EXPANSION; OPERATIONS MANAGEMENT; SEASONAL DEMAND; AGGREGATE; INVENTORY; MODELS; ENVIRONMENT; FUTURE;
D O I
10.1108/IJPDLM-02-2018-0058
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose Significant transitions in firms (e.g. outsourcing) may impact the relative importance of production and inventory assets, affecting the hierarchical separation of planning decisions. The purpose of this paper is to contribute to planning literature by investigating how the production system and the planning environment influence the performance difference between hierarchical and monolithic planning. Further, it seeks to reduce the prevailing theory-practice gap in tactical planning. Design/methodology/approach Through an action research study, a monolithic model integrating tactical production planning decisions, subject to upstream supply chain constraints, with strategic investments decisions was developed, tested and implemented in a global OEM. Using the developed model and a measure of the capital cost of production assets relative to the cost of holding inventory, it is numerically examined how the production system and planning environment influence the performance of hierarchical and monolithic planning. Findings The research demonstrates the potential of integrating decisions and reveals significant performance differences between hierarchical and monolithic planning for firms with low capital cost relative to inventory holding cost. Research limitations/implications The findings suggest a fit between planning processes, the production system and planning environment. Future research should empirically validate the findings and propositions. Originality/value The paper combine capital investments and production planning decisions, which usually transpire at different hierarchical levels and on different time-horizons, and investigates the consequences of hierarchical separation through a real-life validated case and numerical analysis.
引用
收藏
页码:545 / 568
页数:24
相关论文
共 55 条
[1]  
Angelus A., 2000, SIMULTANEOUS PRODUCT, P1
[2]  
Anthony R.N., 1965, Management Planning and Control Systems: A Framework for Research
[3]  
Askar G., 2007, MANAGEMENT LOGISTISC, P235
[4]   Capacity acquisition, subcontracting, and lot sizing [J].
Atamtürk, A ;
Hochbaum, DS .
MANAGEMENT SCIENCE, 2001, 47 (08) :1081-1100
[5]  
Bertrand J.W.M., 2010, RES OPERATIONS MANAG, P265
[6]  
Bitran G.R., 1993, Logistics of Production and Inventory, P523
[7]   Managing capacity and inventory jointly in manufacturing systems [J].
Bradley, JR ;
Glynn, PW .
MANAGEMENT SCIENCE, 2002, 48 (02) :273-288
[8]   The simultaneous planning of production, capacity, and inventory in seasonal demand environments [J].
Bradley, JR ;
Arntzen, BC .
OPERATIONS RESEARCH, 1999, 47 (06) :795-806
[9]   Aggregate planning for seasonal demand: reconciling theory with practice [J].
Buxey, G .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2005, 25 (11) :1083-1100
[10]   Action research for operations management [J].
Coughlan, P ;
Coghlan, D .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2002, 22 (02) :220-240