Scheduling high-grade steelmaking

被引:14
作者
Dorn, J
Shams, R
机构
[1] Christian Doppler Lab for Expert, Systems, Vienna
来源
IEEE EXPERT-INTELLIGENT SYSTEMS & THEIR APPLICATIONS | 1996年 / 11卷 / 01期
关键词
D O I
10.1109/64.482954
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This expert system for scheduling high-grade steel production cuts engineering planning time, allows for greater what-if experimentation, and improves quality control. The complexity of production-cycle scheduling problems had defeated earlier, purely conventional software approaches.
引用
收藏
页码:28 / 35
页数:8
相关论文
共 9 条
[1]  
BARCHINI F, 1988, 7TH P AAAI C MENL PA, P705
[2]  
BAREY MR, 1979, COMPUTERS INTRACTABI
[3]   REACTIVE SCHEDULING - IMPROVING THE ROBUSTNESS OF SCHEDULES AND RESTRICTING THE EFFECTS OF SHOP-FLOOR DISTURBANCES BY FUZZY-REASONING [J].
DORN, J ;
KERR, R ;
THALHAMMER, G .
INTERNATIONAL JOURNAL OF HUMAN-COMPUTER STUDIES, 1995, 42 (06) :687-704
[4]  
DORN J, 1994, 2 IFAC IFIP IFORS WO, P367
[5]  
French S., 1982, Sequencing and Scheduling
[6]  
KERR RM, 1994, CDS9416 U VIENN C DO
[7]  
NUMAO M, 1989, 5 C ART INT APPL WAS, P279
[8]  
OW PS, 1988, ANN OPER RES, V12, P77
[9]  
WOODYATT LR, 1992, JOM FEB, P28