An improved MIP-based approach for a multi-skill workforce scheduling problem

被引:99
作者
Firat, Murat [1 ]
Hurkens, C. A. J. [1 ]
机构
[1] TU Eindhoven, Dept Math & Comp Sci, NL-5600 MB Eindhoven, Netherlands
关键词
Project scheduling; Multi-skill workforce scheduling; Mixed integer programming; STAFF; SELECTION; PROJECTS;
D O I
10.1007/s10951-011-0245-x
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper deals with scheduling complex tasks with an inhomogeneous set of resources. The problem is to assign technicians to tasks with multi-level skill requirements. Here, the requirements are merely the presence of a set of technicians that possess the necessary capabilities. An additional complication is that a set of combined technicians stays together for the duration of a work day. This typically applies to scheduling of maintenance and installation operations. We build schedules by repeated application of a flexible matching model that selects tasks to be processed and forms groups of technicians assigned to combinations of tasks. The underlying mixed integer programming (MIP) model is capable of revising technician-task allocations and performs very well, especially in the case of rare skills.
引用
收藏
页码:363 / 380
页数:18
相关论文
共 22 条
  • [1] Optimizing daily agent scheduling in a multiskill call center
    Avramidis, Athanassios N.
    Chan, Wyean
    Gendreau, Michel
    L'Ecuyer, Pierre
    Pisacane, Ornella
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 200 (03) : 822 - 832
  • [2] A decision aid for the selection and scheduling of software maintenance projects
    Ballou, DP
    Tayi, GK
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS, 1996, 26 (02): : 203 - 212
  • [3] Bellenguez M. O., 2006, THESIS F RABELAIS U
  • [4] Bellenguez M. O., 2005, P ROADEF 2005 TOURS
  • [5] Bellenguez O., 2004, PATAT 2004. Proceedings of the 5th International Conference on the Practice and Theory of Automated Timetabling, P429
  • [6] A branch-and-bound method for solving multi-skill project scheduling problem
    Bellenguez-Morineau, Odile
    Neron, Emmanuel
    [J]. RAIRO-OPERATIONS RESEARCH, 2007, 41 (02) : 155 - 170
  • [7] Resource-constrained project scheduling: Notation, classification, models, and methods
    Brucker, P
    Drexl, A
    Mohring, R
    Neumann, K
    Pesch, E
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) : 3 - 41
  • [8] A genetic algorithm for scheduling staff of mixed skills under multi-criteria
    Cai, X
    Li, KN
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 125 (02) : 359 - 369
  • [9] Scheduling technicians and tasks in a telecommunications company
    Cordeau, Jean-Francois
    Laporte, Gilbert
    Pasin, Federico
    Ropke, Stefan
    [J]. JOURNAL OF SCHEDULING, 2010, 13 (04) : 393 - 409
  • [10] The multi-mode resource-constrained project scheduling problem with generalized precedence relations
    De Reyck, B
    Herroelen, W
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 119 (02) : 538 - 556