Simulation of a Construction Project: Assessing Impact of Just-in-Time and Lean Principles

被引:45
|
作者
Bamana, Flora [1 ]
Lehoux, Nadia [2 ]
Cloutier, Caroline [3 ]
机构
[1] Laval Univ, CIRCERB Ind Chair Ecoresponsible Wood Construct, CIRRELT Interuniv Res Ctr Enterprise Networks Log, Ind Engn,Dept Mech Engn, Quebec City, PQ G1V 0A6, Canada
[2] Laval Univ, CIRCERB Ind Chair Ecoresponsible Wood Construct, CIRRELT Interuniv Res Ctr Enterprise Networks Log, Dept Mech Engn, Quebec City, PQ G1V 0A6, Canada
[3] Laval Univ, CIRRELT Interuniv Res Ctr Enterprise Networks Log, Dept Mech Engn, Quebec City, PQ G1V 0A6, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Just-in-time in construction; Lean in construction; Prefabrication; Simulation; MANAGEMENT;
D O I
10.1061/(ASCE)CO.1943-7862.0001654
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction industry is always searching for better ways to manage construction projects and improve productivity while leaving a smaller ecological footprint. To help with this goal, a simulation model was developed in a 3D simulation modeling framework to examine the impact of successful concepts from the manufacturing industry, such as just-in-time (JIT) deliveries, Lean tools, and prefabrication in construction. The model developed was based on a real 6-story wooden building erected in the province of Quebec, Canada. Through a design of experiment, results of the simulation showed the impact of each concept and their interactions on the construction duration, shortages, and labor utilization. They also put into light the quantitative advantages and disadvantages of implementing 0%, 50%, or 100% Lean management methods, keeping between 1 and 4 days of buffer stock on the construction site, having 80% or 100% prefabrication of components, and using 1 or 2 construction teams. As a result, this paper contributes to the work of scholars and practitioners by simulating a real construction project to assess the impact of prefabrication, JIT, and Lean principles with tangible metrics, construction duration, shortages, and labor utilization.
引用
收藏
页数:15
相关论文
共 32 条
  • [1] Assessing the impact of just-in-time on operational performance at varying degrees of repetitiveness
    Bortolotti, Thomas
    Danese, Pamela
    Romano, Pietro
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (04) : 1117 - 1130
  • [2] Simulation analysis of just-in-time production systems
    Savsar, M
    AlJawini, A
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1995, 42 (01) : 67 - 78
  • [3] Impact of "just-in-time" simulation training for COVID-19 pandemic preparedness
    Ngiam, Nicola
    Fu, Kristy X.
    Ong, Jacqueline S. M.
    ASIA PACIFIC SCHOLAR, 2022, 7 (02): : 17 - 26
  • [4] Managerial and Economical Aspects of the Just-In-Time System "Lean Management in the Time of Pandemic"
    Milewski, Dariusz
    SUSTAINABILITY, 2022, 14 (03)
  • [5] A Dynamic Just-in-Time Component Delivery Framework for Off-Site Construction
    Si, Tongguang
    Li, Hong Xian
    Lei, Zhen
    Liu, Hexu
    Han, SangHyeok
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [6] A Solution to Just-in-Time Delivery for Off-Site Construction: A Conceptual Model
    Si, Tongguang
    Li, Hong Xian
    Hosseini, M. Reza
    Ji, Yingbo
    Liu, Chunlu
    CONSTRUCTION RESEARCH CONGRESS 2020: COMPUTER APPLICATIONS, 2020, : 345 - 353
  • [7] The Impact of Just-in-Time Simulation Training for Healthcare Professionals on Learning and Performance Outcomes: A Systematic Review
    Patocka, Catherine
    Pandya, Anjali
    Brennan, Erin
    Lacroix, Lauren
    Anderson, Ingrid
    Ganshorn, Heather
    Hall, Andrew K.
    SIMULATION IN HEALTHCARE-JOURNAL OF THE SOCIETY FOR SIMULATION IN HEALTHCARE, 2024, 19 (1S): : S32 - S40
  • [8] Applying just-in-time principles in the delivery and management of airport terminal buildings
    Pheng, Low Sui
    Arain, Faisal Manzoor
    Fang, Jolene Wong Yan
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2011, 1 (01) : 104 - 121
  • [9] Construction process reengineering by integrating lean principles and computer simulation techniques
    Mao, Xiaorning
    Zhang, Xueqing
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (05) : 371 - 381
  • [10] Qualitative Evaluation of Just-in-Time Simulation-Based Learning The Learners' Perspective
    Kamdar, Gunjan
    Kessler, David O.
    Tilt, Lindsey
    Srivastava, Geetanjali
    Khanna, Kajal
    Chang, Todd P.
    Balmer, Dorene
    Auerbach, Marc
    SIMULATION IN HEALTHCARE-JOURNAL OF THE SOCIETY FOR SIMULATION IN HEALTHCARE, 2013, 8 (01): : 43 - 48