Risk Assessment in the Industry Chain of Industrialized Construction: A Chinese Case Study

被引:11
作者
Ji, Fanrong [1 ]
Shi, Jili [1 ]
Zhu, Tianle [1 ]
Hu, Xiancun [2 ]
机构
[1] Shandong Jianzhu Univ, Sch Management Engn, Jinan 250101, Peoples R China
[2] Univ Canberra, Sch Design & Built Environm, Canberra, ACT 2601, Australia
关键词
industry chain of industrialized construction; complex networks; comprehensive degrees; risk identification; SUPPLY CHAIN; PREFABRICATED COMPONENTS; BUILDING CONSTRUCTION; BIM IMPLEMENTATION; PROJECTS; CARBON; MANAGEMENT; BARRIERS; BENEFITS; SYSTEM;
D O I
10.3390/buildings12101688
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The industry chain of industrialized construction is a key strategy for promoting the sustainable performance of China's construction industry. Its risk identification is the fundamental step to promote the development of the industry chain. The study was conducted in two phases. The first phase included an extensive literature review and case study analysis to document 32 key factors affecting the process of the industry chain of industrialized construction. In the second phase, 22 key factors influencing the development of the industry chain of industrialized construction in Shandong Province were screened through data collection and expert consultation. A complex network of industrialized construction risk associations (CNICRA) was developed to assess these risks by considering the interrelationship among risks, network nodes, and network edges, and the comprehensive degree indicators for improving the model's accuracy and resolution. The results show that enterprise collaboration level is the most important factor in the industry chain of industrialized construction. The industrialized system is the most transmittable factor of risk. This study investigated a list of risks in the industrialization of construction, optimized a complex network of risk association, and provided theoretical support for risk management of the industry chain of industrialized construction and understanding of risk response strategies for decision makers.
引用
收藏
页数:24
相关论文
共 72 条
  • [1] Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction
    Arashpour, Mehrdad
    Bai, Yu
    Aranda-mena, Guillermo
    Bab-Hadiashar, Alireza
    Hosseini, Reza
    Kalutara, Pushpitha
    [J]. AUTOMATION IN CONSTRUCTION, 2017, 84 : 146 - 153
  • [2] Environmental Awareness and Benefits of Industrialized Building Systems (IBS)
    Bari, Nor Azmi Ahmad
    Abdullah, Nor Ainah
    Yusuff, Rosnah
    Ismail, Napsiah
    Jaapar, Aini
    [J]. ACE-BS 2012 BANGKOK, 2012, 50 : 392 - 404
  • [3] Barriers, Strategies, and Best Practices for BIM Adoption in Quebec Prefabrication Small and Medium-Sized Enterprises (SMEs)
    Ben Mahmoud, Basma
    Lehoux, Nadia
    Blanchet, Pierre
    Cloutier, Caroline
    [J]. BUILDINGS, 2022, 12 (04)
  • [4] A new local and multidimensional ranking measure to detect spreaders in social networks
    Berahmand, Kamal
    Bouyer, Asgarali
    Samadi, Negin
    [J]. COMPUTING, 2019, 101 (11) : 1711 - 1733
  • [5] Improving contractor social networking on IBS infrastructure maintenance projects: a review
    Bin Ismail, Zul-Atfi
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (04) : 479 - 496
  • [6] Planning and controlling design in engineered-to-order prefabricated building systems
    Bolzan Wesz, Josana Gabriele
    Formoso, Carlos Torres
    Tzortzopoulos, Patricia
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (02) : 134 - 152
  • [7] Carbon and Energy Footprints of Prefabricated Industrial Buildings: A Systematic Life Cycle Assessment Analysis
    Bonamente, Emanuele
    Cotana, Franco
    [J]. ENERGIES, 2015, 8 (11) : 12685 - 12701
  • [8] A new direction in social network analysis: Online social network analysis problems and applications
    Can, Umit
    Alatas, Bilal
    [J]. PHYSICA A-STATISTICAL MECHANICS AND ITS APPLICATIONS, 2019, 535
  • [9] A service oriented framework for construction supply chain integration
    Cheng, Jack C. P.
    Law, Kincho H.
    Bjornsson, Hans
    Jones, Albert
    Sriram, Ram
    [J]. AUTOMATION IN CONSTRUCTION, 2010, 19 (02) : 245 - 260
  • [10] Evolution model and quantitative assessment of risk network in housing construction accidents
    Cheng, Lianhua
    Cao, Dongqiang
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (01) : 227 - 246