Anatomy of Construction Disputes

被引:95
作者
Cheung, Sai On [1 ]
Pang, Karen Hoi Yan [1 ]
机构
[1] City Univ Hong Kong, Dept Civil & Architectural Engn, Construct Dispute Resolut Res Unit, Hong Kong, Hong Kong, Peoples R China
关键词
Construction dispute; Fuzzy occurrence likelihood; Web technology; FAULT-TREE; FUZZY; MODEL; CONFLICT;
D O I
10.1061/(ASCE)CO.1943-7862.0000532
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Disputes have been identified as one of the epidemics of the construction industry. Many studies have found that risks, uncertainties, inadequate contract documentation, and behavioral factors are notable dispute sources. Many have described disputes with reference to the subject matter. This approach is pragmatic but has not yet lead to any form of conceptualization. The study contributes to the construction dispute research domain in (1) proposing an anatomy of construction disputes, (2) identifying the key factors contributing to the happening of construction disputes, and (3) providing an example on the use of the anatomy through a dispute occurrence likelihood evaluation exercise. The proposed anatomy distinguishes two types of construction dispute: contractual and speculative. Contract incompleteness is the root cause and underpins both types of construction disputes. In addition, task and people factors fuel contractual and speculative disputes, respectively. The proposed anatomy is arranged under a fault-tree framework whereby the events are linked by logic gates. In this format, construction participants could understand how these events contribute to the occurrence likelihood of disputes. As an illustration, a web-based assessment tool was developed to collect occurrence likelihood assessments of dispute artifacts. The fuzzy occurrence likelihood of construction disputes was then computed. The dispute occurrence likelihood evaluation exercise supports the observation that construction disputes are inevitable. DOI: 10.1061/(ASCE)CO.1943-7862.0000532. (C) 2013 American Society of Civil Engineers.
引用
收藏
页码:15 / 23
页数:9
相关论文
共 48 条
  • [21] A hybrid approach using data envelopment analysis and case-based reasoning for housing refurbishment contractors selection and performance improvement
    Juan, Yi-Kai
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (03) : 5702 - 5710
  • [22] Kales P., 1998, RELIABILITY TECHNOLO
  • [23] Safety analysis in process facilities: Comparison of fault tree and Bayesian network approaches
    Khakzad, Nima
    Khan, Faisal
    Amyotte, Paul
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2011, 96 (08) : 925 - 932
  • [24] Kumaraswamy M.M., 1997, ENG CONSTR ARCHIT MA, V4, P95, DOI DOI 10.1108/EB021042
  • [25] MACNEIL IR, 1975, SOUTHERN CALIF LAW R, V48, P627
  • [26] Masters J.K., 2004, J BUSINESS STRATEGIE, V21, P47
  • [27] Model for understanding, preventing, and resolving project disputes
    Mitropoulos, P
    Howell, G
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (03): : 223 - 231
  • [28] Structural equation model of construction contract dispute potential
    Molenaar, K
    Washington, S
    Diekmann, J
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (04): : 268 - 277
  • [29] Fuzzy AHP approach for selecting the suitable bridge construction method
    Pan, Nang-Fei
    [J]. AUTOMATION IN CONSTRUCTION, 2008, 17 (08) : 958 - 965
  • [30] Assessing failure of bridge construction using fuzzy fault tree analysis
    Pan, Nang-Fei
    Wang, Huaitien
    [J]. FOURTH INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY, VOL 1, PROCEEDINGS, 2007, : 96 - +