Life cycle environmental impacts of decommissioning Magnox nuclear power plants in the UK

被引:20
作者
Wallbridge, Steve [1 ,2 ,3 ]
Banford, Anthony [2 ,3 ]
Azapagic, Adisa [2 ]
机构
[1] Univ Manchester, Sch Mech Aerosp & Civil Engn, Manchester M13 9PL, Lancs, England
[2] Univ Manchester, Sch Chem Engn & Analyt Sci, Manchester M13 9PL, Lancs, England
[3] Dalton Cumbrian Facil, Moor Row CA24 3HA, Cumbria, England
基金
英国工程与自然科学研究理事会;
关键词
Decommissioning; Life cycle environmental impacts; Magnox reactors; Nuclear waste; GREENHOUSE-GAS EMISSIONS; ENERGY;
D O I
10.1007/s11367-012-0534-4
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Full life cycle assessment (LCA) impacts from decommissioning have rarely been assessed, largely because few sites have been decommissioned so that the impacts of decommissioning are currently uncertain. This paper presents the results of an LCA study of the ongoing decommissioning of the Magnox power plant at Trawsfynydd in the UK. These results have been used to estimate the potential environmental impacts for the whole UK Magnox fleet of 11 reactors that will have to be decommissioned during this century. The functional unit is defined as 'decommissioning one Magnox power plant'. The system boundary considers all stages in the life cycle of decommissioning, including site management, waste retrieval, plant deconstruction, packaging and storage of intermediate- and low-level wastes (ILW and LLW). High-level waste, i.e. waste fuel is excluded as it was being removed from the site to be reprocessed at Sellafield. The environmental impacts have been estimated using the CML 2001 methodology. Primary data have been sourced from the Trawsfynydd site and the background from Ecoinvent. Most impacts from decommissioning are due to the plant deconstruction (25-75 %) and ILW storage and disposal (25-70 %). For the example of global warming potential (GWP), estimated at 241 kt CO2 eq./functional unit, or 3.5 g CO2 eq./kWh of electricity generated during the lifetime of the plant, 55 % of the impact is from plant deconstruction and 30 % from ILW disposal. The results for the whole UK Magnox fleet indicate that the impacts vary greatly for different sites. For example, the GWP ranges from 0.89 to 7.14 g CO2 eq./kWh. If the impacts from storage of waste fuel at Sellafield are included in the estimates, the GWP increases on average by four times. Overall, decommissioning of the UK Magnox reactors would generate 2 Mt of CO2 eq. without and 11 Mt of CO2 eq. with the waste from Sellafield. This represents 0.4 and 2 % of the total UK annual emissions, respectively. The impacts of decommissioning can vary greatly at different sites depending on the amount of waste and electricity generated by the plants. Delaying decommissioning to allow the energy system to decarbonise could reduce the environmental impacts, e.g. GWP could be reduced by 50 %. The impacts could also be reduced by reducing the volume of waste and increasing recycling of materials. For example, recycling 70 % of steel would reduce the impacts on average by 34 %.
引用
收藏
页码:990 / 1008
页数:19
相关论文
共 50 条
  • [1] Life cycle environmental impacts of decommissioning Magnox nuclear power plants in the UK
    Steve Wallbridge
    Anthony Banford
    Adisa Azapagic
    The International Journal of Life Cycle Assessment, 2013, 18 : 990 - 1008
  • [2] Environmental impacts of decommissioning nuclear power plants: methodical challenges, case study, and implications
    Seier, Maximilian
    Zimmermann, Till
    INTERNATIONAL JOURNAL OF LIFE CYCLE ASSESSMENT, 2014, 19 (12) : 1919 - 1932
  • [3] Life cycle environmental impacts of fruits consumption in the UK
    Frankowska, Angelina
    Jeswani, Harish Kumar
    Azapagic, Adisa
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2019, 248
  • [4] Life cycle environmental impacts of electricity production by solarthermal power plants in Spain
    Lechon, Yolanda
    de la Rua, Cristina
    Saez, Rosa
    JOURNAL OF SOLAR ENERGY ENGINEERING-TRANSACTIONS OF THE ASME, 2008, 130 (02): : 0210121 - 0210127
  • [5] Comparative assessment of the environmental impacts of nuclear, wind and hydro-electric power plants in Ontario: A life cycle assessment
    Siddiqui, Osamah
    Dincer, Ibrahim
    JOURNAL OF CLEANER PRODUCTION, 2017, 164 : 848 - 860
  • [6] Some aspects of the decommissioning of nuclear power plants
    M. S. Khvostova
    Power Technology and Engineering, 2012, 45 (6) : 447 - 453
  • [7] Thoughts on Decommissioning of Nuclear Power Plants in China
    Wang X.
    Wei S.
    Dai B.
    Hedongli Gongcheng/Nuclear Power Engineering, 2019, 40 (03): : 1 - 5
  • [8] Life after nuclear: Decommissioning power reactors
    Lochbaum, David
    BULLETIN OF THE ATOMIC SCIENTISTS, 2014, 70 (04) : 26 - 36
  • [9] An evaluation of the dismantling technologies for decommissioning of nuclear power plants
    Jeong, KwanSeong
    Choi, ByungSeon
    Moon, Jeikwon
    Hyun, Dongjun
    Lee, JongHwan
    Kim, IkJune
    Kim, GeunHo
    Seo, JaeSeok
    ANNALS OF NUCLEAR ENERGY, 2014, 69 : 62 - 64
  • [10] HAZOP application for the nuclear power plants decommissioning projects
    Rimkeviaus, Sigitas
    Vaisnoras, Mindaugas
    Babilas, Egidijus
    Uspuras, Eugenijus
    ANNALS OF NUCLEAR ENERGY, 2016, 94 : 461 - 471