Modelling the impact of wind generation on electricity market prices in Ireland: An econometric versus unit commitment approach

被引:25
作者
Denny, Eleanor [1 ]
O'Mahoney, Amy [2 ]
Lannoye, Eamonn [3 ]
机构
[1] Trinity Coll Dublin, Dept Econ, Dublin 2, Ireland
[2] Off Gas & Elect Markets Ofgem, London, England
[3] EPRI Int, Dublin, Ireland
关键词
Renewable resources; Marginal pricing; Wind; Merit order; Unit commitment; POWER-SYSTEMS; SPOT PRICES; ENERGY; INTEGRATION; GERMANY; DESIGN; POOL;
D O I
10.1016/j.renene.2016.11.003
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The aim of this research is to assess the impact of wind generation on electricity market prices using two different approaches: an econometric regression model and a unit commitment model (the latter being a methodological approach favoured by the engineering discipline). Overall, the findings of this paper indicate that wind generation reduces the marginal price on the case study electricity system, a result which is consistent across both methodological approaches. The level of savings is non-trivial and in the order of 4-5.4% of total dispatch cost. It is also found that the relationship between wind and prices is linear. The majority of literature in this area uses either an econometric or a unit commitment approach but not both, thus this paper allows for the isolation of the impact of modelling approach on the results. It finds that the results from both methods are comparable and the choice of modelling approach influences the results by just 1.4%. Thus, depending on the type of analysis required, an ex-post econometric model may be preferred by policy makers to an ex-post unit commitment model given the significant reduction in data requirements and computational time involved. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:109 / 119
页数:11
相关论文
共 35 条
[1]   Electricity provision with intermittent sources of energy [J].
Ambec, Stefan ;
Crampes, Claude .
RESOURCE AND ENERGY ECONOMICS, 2012, 34 (03) :319-336
[2]  
[Anonymous], 2009, INT VAR GEN TASK FOR
[3]  
[Anonymous], 2010, RELATIONSHIP WIND GE
[4]  
[Anonymous], SYST DEM WIND GEN DA
[5]   THE GENERALIZED UNIT COMMITMENT PROBLEM [J].
BALDICK, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1995, 10 (01) :465-475
[6]  
CER, 2010, REDP VAL FOR MOD PLE
[7]   The merit order effect of wind and photovoltaic electricity generation in Germany 2008-2016: Estimation and distributional implications [J].
Cludius, Johanna ;
Hermann, Hauke ;
Matthes, Felix Chr ;
Graichen, Verena .
ENERGY ECONOMICS, 2014, 44 :302-313
[8]   Total cost estimates for large-scale wind scenarios in UK [J].
Dale, L ;
Milborrow, D ;
Slark, R ;
Strbac, G .
ENERGY POLICY, 2004, 32 (17) :1949-1956
[9]   The impact of carbon prices on generation-cycling costs [J].
Denny, Eleanor ;
O'Malley, Mark .
ENERGY POLICY, 2009, 37 (04) :1204-1212
[10]   The incentive to invest in thermal plants in the presence of wind generation [J].
Di Cosmo, Valeria ;
Valeri, Laura Malaguzzi .
ENERGY ECONOMICS, 2014, 43 :306-315