Managing uncertainty in ERP-controlled manufacturing environments in SMEs

被引:62
作者
Koh, SCL
Saad, SM
机构
[1] Univ Sheffield, Sch Management, Sheffield S1 4DT, S Yorkshire, England
[2] Sheffield Hallam Univ, Sch Engn, Sheffield S1 1WB, S Yorkshire, England
关键词
uncertainty; SMEs; MRP/MRPII/ERP;
D O I
10.1016/j.ijpe.2005.05.011
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This research examines how and to what extent uncertainty disturbs the SMEs in the manufacturing sector, which plan and schedule their production using MRP, MRPII or ERP system, and proposes to apply a business model to manage uncertainty. This environment is termed the ERP-controlled manufacturing environments. A comprehensive literature review found that various buffering and dampening techniques have been used to tackle uncertainty. The results of which show consistent late delivery performance, reinforcing that there is a clear shortage of knowledge and guidance on how to tackle uncertainty, particularly in these SMEs. In this study, a business model that enables diagnosis of underlying causes of uncertainty is applied through a questionnaire survey in order to identify the types of underlying causes that are more likely to result in late delivery. The survey results provide the SMEs with a reference on the underlying causes of uncertainty that must be tackled with higher priority. Simulation modelling and experimental study of the underlying causes of uncertainty on late delivery based on a real case study verify and validate this suggestion. (c) 2005 Elsevier B.V. All rights reserved.
引用
收藏
页码:109 / 127
页数:19
相关论文
共 23 条
[1]  
ANGEROSA AM, 1999, APICS PERFORMAN 1004
[2]  
[Anonymous], INTRO SIMULATION USI
[3]   A STRUCTURED ANALYSIS OF MATERIAL REQUIREMENTS PLANNING SYSTEMS UNDER COMBINED DEMAND AND SUPPLY UNCERTAINTY [J].
BRENNAN, L ;
GUPTA, SM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (07) :1689-1707
[4]   MRP performance effects due to lot size and planned lead time settings [J].
Enns, ST .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (03) :461-480
[5]  
Frizelle G. D. M., 1998, P ADV SUMM I ESPR NE, P159
[6]   A review of techniques for buffering against uncertainty with MRP systems [J].
Guide, VDR ;
Srivastava, R .
PRODUCTION PLANNING & CONTROL, 2000, 11 (03) :223-233
[7]  
HO CJ, 1995, INT J PROD RES, V33, P483, DOI 10.1080/00207549508930161
[8]   An investigation of alternative dampening procedures to cope with MRP system nervousness [J].
Ho, CJ ;
Carter, PL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (01) :137-156
[9]  
Kelton DW, 2000, SIMULATION MODELLING
[10]  
KOH SC, 2000, J LOGISTICS INFORMAT, V13, P177