An effective iterative greedy algorithm for distributed blocking flowshop scheduling problem with balanced energy costs criterion

被引:37
|
作者
Han, Xue [1 ]
Han, Yuyan [1 ]
Zhang, Biao [1 ]
Qin, Haoxiang [1 ]
Li, Junqing [2 ]
Liu, Yiping
Gong, Dunwei [3 ,4 ]
机构
[1] Liaocheng Univ, Sch Comp Sci, Liaocheng 252000, Peoples R China
[2] Shandong Normal Univ, Sch Comp Sci, Jinan 252000, Peoples R China
[3] Hunan Univ, Coll Comp Sci & Elect Engn, Hunan 410082, Peoples R China
[4] China Univ Min & Technol, Sch Informat & Control Engn, Xuzhou 221116, Peoples R China
基金
中国国家自然科学基金;
关键词
Distributed flowshop scheduling problem; Blocking; Energy consumption cost; Local search algorithm; Variable neighborhood search; WHALE SWARM ALGORITHM; TOTAL FLOWTIME; SETUP TIMES; HEURISTICS; SHOP; METAHEURISTICS;
D O I
10.1016/j.asoc.2022.109502
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
With the increase in production levels, a pattern of industrial production has shifted from a single factory to multiple factories, resulting in a distributed production model. The distributed flowshop scheduling problem (DPFSP) is of great research significance as a frequent pattern in real production activities. In this paper, according to real-world scenarios, we have added blocking constraints and sequence-dependent setup times (SDST) to the DFSP and proposed a distributed blocking flowshop scheduling problem with sequence-dependent setup times (DBFSP_SDST). In a distributed environment, the allocation of resources and utilization have become an urgent problem to be solved. In addition, scheduling problems related to resource conservation have also attracted increasing attention. Therefore, we study DBFSP_SDST and consider minimizing the energy consumption cost of the critical factory (critical factory is the factory with maximum energy consumption cost) under resource balance. To tackle this problem, an effective iterated greedy algorithm based on a learning-based variable neighborhood search algorithm (VNIG) is proposed. In VNIG, an efficient construction heuristic is well designed. Two different local searches based on the characteristics of the proposed problem are developed to enhance the local exploitation by neighborhood searching. A learning-based selection variable neighborhood search strategy is designed to avoid the solution trapping in local optima. By conducting extensive simulation experiments, the proposed VNIG shows superior performance compared with artificial chemical reaction optimization (CRO, 2017), the discrete artificial bee colony algorithm (DABC, 2018), the iterative greedy algorithm with a variable neighborhood search scheme (IGR, 2021), and the evolution strategy approach (ES, 2022).(c) 2022 Elsevier B.V. All rights reserved.
引用
收藏
页数:19
相关论文
共 50 条
  • [41] An evolution strategy approach for the distributed blocking flowshop scheduling problem
    Karabulut, Korhan
    Kizilay, Damla
    Tasgetiren, M. Fatih
    Gao, Liang
    Kandiller, Levent
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 163
  • [42] Scheduling of distributed blocking flowshop with setup times using a Two-stage perturbation iterated greedy algorithm
    Zhang, Chenyao
    Wang, Yuting
    Wang, Yuhang
    Wang, Yong
    Li, Chengshuai
    Yang, Feng
    2023 35TH CHINESE CONTROL AND DECISION CONFERENCE, CCDC, 2023, : 1108 - 1113
  • [43] An improved artificial bee colony algorithm for the blocking flowshop scheduling problem
    Han, Yu-Yan
    Pan, Quan-Ke
    Li, Jun-Qing
    Sang, Hong-yan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 60 (9-12) : 1149 - 1159
  • [44] A collaborative iterative greedy algorithm for the scheduling of distributed heterogeneous hybrid flow shop with blocking constraints
    Qin, Hao-Xiang
    Han, Yu-Yan
    EXPERT SYSTEMS WITH APPLICATIONS, 2022, 201
  • [45] An Iterative Greedy Algorithm With Q-Learning Mechanism for the Multiobjective Distributed No-Idle Permutation Flowshop Scheduling
    Zhao, Fuqing
    Zhuang, Changxue
    Wang, Ling
    Dong, Chenxin
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2024, 54 (05): : 3207 - 3219
  • [46] An accelerated discrete artificial bee colony algorithm under the makespan constraint: Solving the distributed blocking flow shop scheduling problem with balanced energy consumption costs
    Zhang, Chenyao
    Han, Yuyan
    Wang, Yuting
    Li, Junqing
    Gao, Kaizhou
    EXPERT SYSTEMS WITH APPLICATIONS, 2025, 260
  • [47] Effective heuristics for the blocking flowshop scheduling problem with makespan minimization
    Pan, Quan-Ke
    Wang, Ling
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2012, 40 (02): : 218 - 229
  • [48] A new iterated greedy algorithm for no-idle permutation flowshop scheduling with the total tardiness criterion
    Riahi, Vahid
    Chiong, Raymond
    Zhang, Yuli
    COMPUTERS & OPERATIONS RESEARCH, 2020, 117
  • [49] Effective constructive heuristic and iterated greedy algorithm for distributed mixed blocking permutation flow-shop scheduling problem
    Shao, Zhongshi
    Shao, Weishi
    Pi, Dechang
    KNOWLEDGE-BASED SYSTEMS, 2021, 221
  • [50] A cooperative iterated greedy algorithm for the distributed flowshop group robust scheduling problem with uncertain processing times
    Wang, Zhi-Yuan
    Pan, Quan-Ke
    Gao, Liang
    Jing, Xue-Lei
    Sun, Qing
    SWARM AND EVOLUTIONARY COMPUTATION, 2023, 79