An effective iterative greedy algorithm for distributed blocking flowshop scheduling problem with balanced energy costs criterion

被引:42
作者
Han, Xue [1 ]
Han, Yuyan [1 ]
Zhang, Biao [1 ]
Qin, Haoxiang [1 ]
Li, Junqing [2 ]
Liu, Yiping
Gong, Dunwei [3 ,4 ]
机构
[1] Liaocheng Univ, Sch Comp Sci, Liaocheng 252000, Peoples R China
[2] Shandong Normal Univ, Sch Comp Sci, Jinan 252000, Peoples R China
[3] Hunan Univ, Coll Comp Sci & Elect Engn, Hunan 410082, Peoples R China
[4] China Univ Min & Technol, Sch Informat & Control Engn, Xuzhou 221116, Peoples R China
基金
中国国家自然科学基金;
关键词
Distributed flowshop scheduling problem; Blocking; Energy consumption cost; Local search algorithm; Variable neighborhood search; WHALE SWARM ALGORITHM; TOTAL FLOWTIME; SETUP TIMES; HEURISTICS; SHOP; METAHEURISTICS;
D O I
10.1016/j.asoc.2022.109502
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
With the increase in production levels, a pattern of industrial production has shifted from a single factory to multiple factories, resulting in a distributed production model. The distributed flowshop scheduling problem (DPFSP) is of great research significance as a frequent pattern in real production activities. In this paper, according to real-world scenarios, we have added blocking constraints and sequence-dependent setup times (SDST) to the DFSP and proposed a distributed blocking flowshop scheduling problem with sequence-dependent setup times (DBFSP_SDST). In a distributed environment, the allocation of resources and utilization have become an urgent problem to be solved. In addition, scheduling problems related to resource conservation have also attracted increasing attention. Therefore, we study DBFSP_SDST and consider minimizing the energy consumption cost of the critical factory (critical factory is the factory with maximum energy consumption cost) under resource balance. To tackle this problem, an effective iterated greedy algorithm based on a learning-based variable neighborhood search algorithm (VNIG) is proposed. In VNIG, an efficient construction heuristic is well designed. Two different local searches based on the characteristics of the proposed problem are developed to enhance the local exploitation by neighborhood searching. A learning-based selection variable neighborhood search strategy is designed to avoid the solution trapping in local optima. By conducting extensive simulation experiments, the proposed VNIG shows superior performance compared with artificial chemical reaction optimization (CRO, 2017), the discrete artificial bee colony algorithm (DABC, 2018), the iterative greedy algorithm with a variable neighborhood search scheme (IGR, 2021), and the evolution strategy approach (ES, 2022).(c) 2022 Elsevier B.V. All rights reserved.
引用
收藏
页数:19
相关论文
共 47 条
[1]   Artificial bee colony algorithm including some components of iterated greedy algorithm for permutation flow shop scheduling problems [J].
Arik, Oguzhan Ahmet .
NEURAL COMPUTING & APPLICATIONS, 2021, 33 (08) :3469-3486
[2]   A novel chemical reaction optimization for the distributed permutation flowshop scheduling problem with makespan criterion [J].
Bargaoui, Hafewa ;
Driss, Olfa Belkahla ;
Ghedira, Khaled .
COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 111 :239-250
[3]   A collaborative optimization algorithm for energy-efficient multi-objective distributed no-idle flow-shop scheduling [J].
Chen, Jing-fang ;
Wang, Ling ;
Peng, Zhi-ping .
SWARM AND EVOLUTIONARY COMPUTATION, 2019, 50
[4]  
Chen S, 2020, CHIN CONTR CONF, P1536, DOI 10.23919/CCC50068.2020.9188884
[5]   New Benchmark Algorithm for Minimizing Total Completion Time in blocking flowshops with sequence-dependent setup times [J].
Cheng, Chen-Yang ;
Pourhejazy, Pourya ;
Ying, Kuo-Ching ;
Huang, Shi-Yao .
APPLIED SOFT COMPUTING, 2021, 104
[6]   Green scheduling of distributed two-stage reentrant hybrid flow shop considering distributed energy resources and energy storage system [J].
Dong, Jun ;
Ye, Chunming .
COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 169
[7]   The distributed permutation flow shop to minimise the total flowtime [J].
Fernandez-Viagas, Victor ;
Perez-Gonzalez, Paz ;
Framinan, Jose M. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 118 :464-477
[8]   A bounded-search iterated greedy algorithm for the distributed permutation flowshop scheduling problem [J].
Fernandez-Viagas, Victor ;
Framinan, Jose M. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (04) :1111-1123
[9]   An effective metaheuristic with a differential flight strategy for the distributed permutation flowshop scheduling problem with sequence-dependent setup times [J].
Guo, Heng-wei ;
Sang, Hong-yan ;
Zhang, Biao ;
Meng, Lei-lei ;
Liu, Li-li .
KNOWLEDGE-BASED SYSTEMS, 2022, 242
[10]   Discrete evolutionary multi-objective optimization for energy-efficient blocking flow shop scheduling with setup time [J].
Han, Yuyan ;
Li, Junqing ;
Sang, Hongyan ;
Liu, Yiping ;
Gao, Kaizhou ;
Pan, Quanke .
APPLIED SOFT COMPUTING, 2020, 93