共 50 条
- [28] A two-stage flow shop scheduling problem with transportation considerations 4OR, 2015, 13 : 381 - 402
- [29] An improved shuffled frog leaping algorithm for the distributed two-stage hybrid flow shop scheduling Lei, De-Ming (deminglei11@163.com), 1600, Northeast University (36): : 241 - 248