Application of a probabilistic risk assessment methodology to a lead smelter site

被引:23
|
作者
Griffin, S
Goodrum, PE
Diamond, GL
Meylan, W
Brattin, WJ
Hassett, JM
机构
[1] US EPA, Denver, CO 80202 USA
[2] SUNY Coll Environm Sci & Forestry, Fac Environm Resource & Forest Engn, Syracuse, NY 13210 USA
[3] Syracuse Res Corp, N Syracuse, NY 13212 USA
[4] ISSI Consulting Grp Inc, Denver, CO 80202 USA
来源
HUMAN AND ECOLOGICAL RISK ASSESSMENT | 1999年 / 5卷 / 04期
关键词
IEUBK; ISE; blood lead; Monte Carlo; uncertainty; variability;
D O I
10.1080/10807039991289699
中图分类号
X176 [生物多样性保护];
学科分类号
090705 ;
摘要
Exposure of children to lead in the environment was assessed at the Murray Smelter Superfund site using both a deterministic risk assessment approach, the Integrated Exposure Uptake Biokinetic (IEUBK) model, and a probabilistic approach, the Integrated Stochastic Exposure (ISE) model. When site-specific data on lead in environmental media were input as point estimates into the IEUBK model, unacceptable risks were predicted for children living within five of eight study zones. The predicted soil cleanup goal was 550 ppm. Concentration and exposure data were then input into the ISE model as probability distribution functions and a one-dimensional Monte Carlo analysis (1-D MCA) was run to predict the expected distribution of exposures and blood lead values. Uncertainty surrounding these predictions was examined in a two-dimensional Monte Carlo analysis (2-D MCA). The ISE model predicted risks that were in the same rank order as those predicted by the IEUBK model, although the probability estimates of exceeding a blood lead level of 10 mu g/dl (referred to as the P10) from the ISE model were uniformly lower than those predicted by the IEUBK model. The 2-D MCA allowed evaluation of the confidence around each P10 level, and identified the main sources of both uncertainty and variability in exposure estimates. The ISE model suggested cleanup goals ranging from 1300 to 1500 ppm might be protective at this site.
引用
收藏
页码:845 / 868
页数:24
相关论文
共 50 条
  • [21] Going beyond the single number: Using probabilistic risk assessment to improve risk management
    Thompson, KM
    Graham, JD
    HUMAN AND ECOLOGICAL RISK ASSESSMENT, 1996, 2 (04): : 1008 - 1034
  • [22] Elicitation for food microbial risk assessment: a probabilistic approach extending Risk Ranger proposal
    Guillier, Laurent
    Kabunda, Jean-Marc
    Denis, Jean-Baptiste
    Albert, Isabelle
    JOURNAL OF THE SFDS, 2013, 154 (03): : 113 - 123
  • [23] A co-operative approach to risk management in an active lead zinc smelter community
    Hilts, SR
    ENVIRONMENTAL GEOCHEMISTRY AND HEALTH, 1996, 18 (01) : 17 - 24
  • [24] Probabilistic design and analysis of building performances: Methodology and application example
    Van Gelder, Liesje
    Janssen, Hans
    Roels, Staf
    ENERGY AND BUILDINGS, 2014, 79 : 202 - 211
  • [25] The concentration term and derivation of cleanup goals using probabilistic risk assessment
    Bowers, TS
    HUMAN AND ECOLOGICAL RISK ASSESSMENT, 1999, 5 (04): : 809 - 821
  • [26] The use of probabilistic risk assessment in establishing drinking water quality objectives
    Rai, SN
    Bartlett, S
    Krewski, D
    Paterson, J
    HUMAN AND ECOLOGICAL RISK ASSESSMENT, 2002, 8 (03): : 493 - 509
  • [27] Probabilistic assessment of roadway departure risk in a curve
    Rey, G.
    Clair, D.
    Fogli, M.
    Bernardin, F.
    VEHICLE SYSTEM DYNAMICS, 2011, 49 (10) : 1649 - 1671
  • [28] Probabilistic Risk Assessment - The Keystone for the Future of Toxicology
    Maertens, Alexandra
    Golden, Emily
    Luechtefeld, Thomas H.
    Hoffmann, Sebastian
    Tsaioun, Katya
    Hartung, Thomas
    ALTEX-ALTERNATIVES TO ANIMAL EXPERIMENTATION, 2022, 39 (01) : 3 - 29
  • [29] Probabilistic risk assessment: Betting on its future
    Power, M
    McCarty, LS
    HUMAN AND ECOLOGICAL RISK ASSESSMENT, 1996, 2 (01): : 30 - 34
  • [30] Probabilistic Storm Surge Hazard Assessment for a Site on Lake Huron
    Dababneh, Ahmed Jemie
    Oskamp, Jeffrey A.
    Edwards, Tom
    INTERNATIONAL JOURNAL OF OFFSHORE AND POLAR ENGINEERING, 2016, 26 (04) : 401 - 407