The relation between the shop floor energy system and the manufacturing process optimality

被引:1
|
作者
Badea, N. [1 ]
Frumusanu, G. [2 ]
Epureanu, A. [2 ]
机构
[1] Univ Galatzi, Automat Control & Elect Engn Dept, Galati 800210, Romania
[2] Univ Galatzi, Dept Mfg Engn, Galati 800201, Romania
来源
MODERN TECHNOLOGIES IN INDUSTRIAL ENGINEERING (MODTECH2015) | 2015年 / 95卷
关键词
D O I
10.1088/1757-899X/95/1/012022
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Nowadays, the overhead expenses are a significant component of the manufacturing cost. The expenditures occasioned by running the shop floor energy system are one of the most important among the overhead expenses. However, the manufacturing process optimization actually does not take into account these expenses. More than that, the expenses for running the shop floor energy system are not constant, varying after the external environment seasonal conditions, and they are depending on several issues, like the building's energetic exchange with its environment, or the loading degree of the machine tools from the shop floor. This paper approaches the relation between the shop floor energy system expenditures, on one hand, and the manufacturing process optimality, on the other hand. A case study, revealing the influence of the shop floor energy system on the manufacturing cost-optimal solution is also included.
引用
收藏
页数:7
相关论文
共 50 条
  • [21] Alternative shop floor control of a flexible manufacturing system - A temporal rescheduling approach
    Lin, CWR
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2000, 7 (02): : 168 - 178
  • [22] Shop floor control system for agile manufacturing based on a multi-agent
    Qin, Xiaobin
    Shi, Ke
    Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2002, 30 (02):
  • [23] An example of a shop-floor control system application in a Polish manufacturing company
    Chrobot, Jaroslaw
    Klukowski, Andrzej
    Koch, Jan
    Rakowski, Jaroslaw
    Smalec, Zbigniew
    Weiner, Markus
    Human Systems Management, 1999, 18 (3-4): : 245 - 252
  • [24] Alternative shop floor control of a flexible manufacturing system - a temporal rescheduling approach
    Lin, Chun-Wei R.
    International Journal of Industrial Engineering : Theory Applications and Practice, 2000, 7 (02): : 168 - 178
  • [25] An example of a shop-floor control system application in a Polish manufacturing company
    ITMiA, Wroclaw, Poland
    不详
    不详
    Hum Syst Manage, 3-4 (245-252):
  • [26] Implementation of web-based manufacturing process aid in the electronic assembly shop floor
    Li, Debiao
    Raghavan, Venkatesh
    Yoon, Sang Won
    JOURNAL OF INTELLIGENT MANUFACTURING, 2015, 26 (06) : 1281 - 1290
  • [27] Implementation of web-based manufacturing process aid in the electronic assembly shop floor
    Debiao Li
    Venkatesh Raghavan
    Sang Won Yoon
    Journal of Intelligent Manufacturing, 2015, 26 : 1281 - 1290
  • [28] Design and development of a proximity warning system for improved safety on the manufacturing shop floor
    Mgbemena C.E.
    Onuoha D.O.
    Okpala C.C.
    Mgbemena C.O.
    Journal of King Saud University - Engineering Sciences, 2022, 34 (05) : 339 - 343
  • [29] People at Work: Modelling Human Performance in Shop Floor for Process Improvement in Manufacturing Enterprises
    Khalil, Siti Nurhaida
    Weston, R. H.
    Ajaefobi, J. O.
    LEVERAGING KNOWLEDGE FOR INNOVATION IN COLLABORATIVE NETWORKS, 2009, 307 : 274 - 281
  • [30] Process planning interface for a shop floor control architecture for computer-integrated manufacturing
    Lee, S., 1600, Taylor & Francis Ltd, Basingstoke, United Kingdom (33):