Resource dedication problem in a multi-project environment

被引:33
|
作者
Besikci, Umut [1 ]
Bilge, Umit [1 ]
Ulusoy, Gunduz [2 ]
机构
[1] Bogazici Univ, Istanbul, Turkey
[2] Sabanci Univ, Istanbul, Turkey
关键词
Multi-project scheduling; Resource dedication problem; Resource preference; Lagrangian relaxation; MRCPSP; SCHEDULING PROBLEM; GENETIC ALGORITHM; LIMITED RESOURCES; MODES; HEURISTICS; COSTS;
D O I
10.1007/s10696-012-9140-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
There can be different approaches to the management of resources within the context of multi-project scheduling problems. In general, approaches to multi-project scheduling problems consider the resources as a pool shared by all projects. On the other hand, when projects are distributed geographically or sharing resources between projects is not preferred, then this resource sharing policy may not be feasible. In such cases, the resources must be dedicated to individual projects throughout the project durations. This multi-project problem environment is defined here as the resource dedication problem (RDP). RDP is defined as the optimal dedication of resource capacities to different projects within the overall limits of the resources and with the objective of minimizing a predetermined objective function. The projects involved are multi-mode resource constrained project scheduling problems with finish to start zero time lag and non-preemptive activities and limited renewable and nonrenewable resources. Here, the characterization of RDP, its mathematical formulation and two different solution methodologies are presented. The first solution approach is a genetic algorithm employing a new improvement move called combinatorial auction for RDP, which is based on preferences of projects for resources. Two different methods for calculating the projects' preferences based on linear and Lagrangian relaxation are proposed. The second solution approach is a Lagrangian relaxation based heuristic employing subgradient optimization. Numerical studies demonstrate that the proposed approaches are powerful methods for solving this problem.
引用
收藏
页码:206 / 229
页数:24
相关论文
共 50 条
  • [31] Collaborative evolutionary multi-project resource scheduling
    Shackelford, M
    Corne, D
    PROCEEDINGS OF THE 2001 CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1 AND 2, 2001, : 1131 - 1138
  • [32] A simulation model for multi-project resource allocation
    Fatemi Ghomi, S.M.T.
    Ashjari, B.
    International Journal of Project Management, 2002, 20 (02) : 127 - 130
  • [33] Modeling and improved algorithm for resource constrained multi-project scheduling problem based on project splitting with resource transfer time
    Zhu H.
    Lu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (03): : 586 - 597
  • [34] Solving resource-constrained multi-project environment under different activity assumptions
    Ben Issa S.
    Patterson R.A.
    Tu Y.
    International Journal of Production Economics, 2021, 232
  • [35] Project Scheduling with Dynamic Resource Allocation in a Multi-project Environment. Case: Bogota Electricity Distributor
    Javier Rueda-Velasco, Feizar
    Efrain Cubaque, Carlos
    Ibanez Latorre, Juan Martin
    APPLIED COMPUTER SCIENCES IN ENGINEERING, 2017, 742 : 589 - 600
  • [36] Constraints based scheduling in the multi-project environment
    Skolud, Bozena
    Zientek, Aleksandra
    Computer Assisted Mechanics and Engineering Sciences, 2005, 12 (2-3): : 247 - 257
  • [37] Research on priority rules for the stochastic resource constrained multi-project scheduling problem with new project arrival
    Chen, HaoJie
    Ding, Guofu
    Zhang, Jian
    Qin, Shengfeng
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 137
  • [38] Resource allocation under uncertainty in a multi-project matrix environment: Is organizational conflict inevitable?
    Department of Industrial Engineering and Management, Sami Shamoon College of Engineering, Beer Sheva, Israel
    不详
    International Journal of Project Management, 2008, 26 (08) : 773 - 788
  • [39] Dynamic order acceptance and capacity planning in a stochastic multi-project environment with a bottleneck resource
    Melchiors, Philipp
    Leus, Roel
    Creemers, Stefan
    Kolisch, Rainer
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (1-2) : 459 - 475
  • [40] Optimization of Resource-Constrained Multi-Project Scheduling Problem based on the genetic algorithm
    Shu, Xin
    Su, Qiang
    Wang, Qian
    Wang, Qiugen
    2018 15TH INTERNATIONAL CONFERENCE ON SERVICE SYSTEMS AND SERVICE MANAGEMENT (ICSSSM), 2018,