Resource dedication problem in a multi-project environment

被引:38
作者
Besikci, Umut [1 ]
Bilge, Umit [1 ]
Ulusoy, Gunduz [2 ]
机构
[1] Bogazici Univ, Istanbul, Turkey
[2] Sabanci Univ, Istanbul, Turkey
关键词
Multi-project scheduling; Resource dedication problem; Resource preference; Lagrangian relaxation; MRCPSP; SCHEDULING PROBLEM; GENETIC ALGORITHM; LIMITED RESOURCES; MODES; HEURISTICS; COSTS;
D O I
10.1007/s10696-012-9140-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
There can be different approaches to the management of resources within the context of multi-project scheduling problems. In general, approaches to multi-project scheduling problems consider the resources as a pool shared by all projects. On the other hand, when projects are distributed geographically or sharing resources between projects is not preferred, then this resource sharing policy may not be feasible. In such cases, the resources must be dedicated to individual projects throughout the project durations. This multi-project problem environment is defined here as the resource dedication problem (RDP). RDP is defined as the optimal dedication of resource capacities to different projects within the overall limits of the resources and with the objective of minimizing a predetermined objective function. The projects involved are multi-mode resource constrained project scheduling problems with finish to start zero time lag and non-preemptive activities and limited renewable and nonrenewable resources. Here, the characterization of RDP, its mathematical formulation and two different solution methodologies are presented. The first solution approach is a genetic algorithm employing a new improvement move called combinatorial auction for RDP, which is based on preferences of projects for resources. Two different methods for calculating the projects' preferences based on linear and Lagrangian relaxation are proposed. The second solution approach is a Lagrangian relaxation based heuristic employing subgradient optimization. Numerical studies demonstrate that the proposed approaches are powerful methods for solving this problem.
引用
收藏
页码:206 / 229
页数:24
相关论文
共 27 条
[1]   Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms [J].
Alcaraz, J ;
Maroto, C ;
Ruiz, R .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2003, 54 (06) :614-626
[2]   HEURISTICS FOR SCHEDULING PROJECTS WITH RESOURCE RESTRICTIONS AND SEVERAL RESOURCE-DURATION MODES [J].
BOCTOR, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (11) :2547-2558
[3]  
Bouleimen K, 1998, P 6 INT WORKSH PROJ, V49, P268
[4]   Resource-constrained project scheduling: Notation, classification, models, and methods [J].
Brucker, P ;
Drexl, A ;
Mohring, R ;
Neumann, K ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) :3-41
[5]   A genetic algorithm for the resource constrained multi-project scheduling problem [J].
Goncalves, J. F. ;
Mendes, J. J. M. ;
Resende, M. G. C. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) :1171-1190
[6]   Project scheduling with multiple modes: A genetic algorithm [J].
Hartmann, S .
ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) :111-135
[7]   Resource-constrained project scheduling: A survey of recent developments [J].
Herroelen, W ;
De Reyck, B ;
Demeulemeester, E .
COMPUTERS & OPERATIONS RESEARCH, 1998, 25 (04) :279-302
[8]   Simulated annealing for multi-mode resource-constrained project scheduling [J].
Józefowska, J ;
Mika, M ;
Rózycki, R ;
Waligóra, G ;
Weglarz, J .
ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) :137-155
[9]   MULTI-PROJECT SCHEDULING WITH EXPLICIT LATENESS COSTS [J].
KIM, SY ;
LEACHMAN, RC .
IIE TRANSACTIONS, 1993, 25 (02) :34-44
[10]   An integrated survey of deterministic project scheduling [J].
Kolisch, R ;
Padman, R .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2001, 29 (03) :249-272