THE IMPORTANCE OF PRE-PLANNING FOR LARGE HYDROSTATIC TEST PROGRAMS

被引:0
|
作者
Bennett, Andrew Keith [1 ]
Wong, Everett Clementi [1 ]
机构
[1] WorleyParsons Calgary, Calgary, AB, Canada
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业];
学科分类号
0820 ;
摘要
Large hydrostatic test programs require extensive pre-planning to avoid increased costs and delayed schedules. Recently, Enbridge Pipelines Inc. completed construction and testing of more than 1,200 kin of an NPS 36 oil pipeline for the Line 4 Extension Project and the Canadian portion of the Alberta Clipper Expansion Project over three construction seasons. A total of 57 mainline hydrostatic tests were successfully completed and approved by the National Energy Board. Following the first construction and hydrostatic testing season, many lessons were learned that were implemented for hydrostatic testing during the second construction season. The most important aspect of large pipeline hydrostatic test programs is locating and securing water sources. Extensive ground truthing must be preformed to adequately determine locations, volumes and access to water sources. Once potential sources are identified, water quality and environmental issues must be assessed, which leads to applying for and obtaining the necessary permits for water withdrawal and discharge. Leaving an important item such as water sources to be "field-determined" can lead to unanticipated complications, schedule delay and increased construction costs. Water sources are just one of the many important pre-planning activities that must be given adequate attention before the start of pipeline construction to successfully and efficiently manage a large pipeline hydrostatic test program. Many projects only complete high-level desktop-based hydrostatic test planning during the detailed design phase of a project. However, the potential cost and schedule impacts far outweigh the extra costs required to complete proper pre-planning during the detailed engineering phase of a project.
引用
收藏
页码:99 / 103
页数:5
相关论文
共 50 条
  • [31] CT image applications for pre-surgical assessment and surgical pre-planning in Pediatric Dentistry
    Kubo, Shuhei
    Shigeta, Yuko
    Ogawa, Takumi
    Wakoh, Mamoru
    Sano, Tsukasa
    Fukushima, Shunji
    Yakushiji, Masashi
    MEDICINE MEETS VIRTUAL REALITY 16, 2008, 132 : 222 - 224
  • [32] Hospital surge capacity: The importance of better hospital pre-planning to cope with patient surge during dengue epidemics - A systematic review
    Rathnayake, Dimuthu
    Clarke, Mike
    Jayasooriya, Lucian
    INTERNATIONAL JOURNAL OF HEALTHCARE MANAGEMENT, 2021, 14 (03) : 723 - 730
  • [33] Department of the Ministry of Higher Non-art Large-scale Theatrical Show Themes and Pre-planning Studies
    Guo, Xinyuan
    2013 3RD INTERNATIONAL CONFERENCE ON EDUCATION AND EDUCATION MANAGEMENT (EEM 2013), 2013, 27 : 548 - 552
  • [34] A Method for Dose Calculation and Collision Detection in Gamma Plan Pre-Planning Mode
    Bennett, M. C.
    Wiant, D.
    Gersh, J.
    Best, R.
    Bourland, J. Daniel
    MEDICAL PHYSICS, 2010, 37 (06)
  • [35] ON A FAMILY OF MATHEMATICAL MODELS FOR PRE-PLANNING ANALYSIS OF A COMPLEX TECHNOLOGICAL SYSTEM.
    Malashenko, Yu.Ye.
    Ushakov, I.A.
    Engineering cybernetics, 1983, 20 (03): : 63 - 70
  • [36] A CT-BASED TOPOGRAPHICAL METHOD FOR PRE-PLANNING INTERSTITIAL BRACHYTHERAPY OF THE BRAIN
    WU, A
    ZAMENHOF, RG
    STERNICK, ES
    MEDICAL PHYSICS, 1986, 13 (04) : 587 - 587
  • [37] FIRE IN THE OPERATING-THEATER - EVACUATION PRE-PLANNING MAY SAVE LIVES
    MOXON, MA
    WARD, ME
    ANAESTHESIA, 1986, 41 (05) : 543 - 546
  • [38] Container stowage pre-planning: using search to generate solutions, a case study
    Wilson, ID
    Roach, PA
    Ware, JA
    KNOWLEDGE-BASED SYSTEMS, 2001, 14 (3-4) : 137 - 145
  • [39] PMP: Cost-effective Forced Execution with Probabilistic Memory Pre-planning
    You, Wei
    Zhang, Zhuo
    Kwon, Yonghwi
    Aafer, Yousra
    Peng, Fei
    Shi, Yu
    Harmon, Carson
    Zhang, Xiangyu
    2020 IEEE SYMPOSIUM ON SECURITY AND PRIVACY (SP 2020), 2020, : 1121 - 1138
  • [40] PRE-PLANNING ANKLE ARTHRODESIS USING 3D RECONSTRUCTED TOMOGRAPHIES
    Astolfi, Rodrigo Schroll
    Bezerra Carrah, Marcio De Paiva
    Cordeiro, Guilherme Farias
    Lopes, Jailson Rodrigues
    Diogenes Teixeira, Manuel Joaquim
    Dias Leite, Jose Alberto
    ACTA ORTOPEDICA BRASILEIRA, 2020, 28 (02): : 60 - 64