Numerical Analysis and Deformation Mechanism Study on an Excavated High-Steep Slope of a Hydropower Station

被引:2
|
作者
Shi, Guangcheng [1 ,2 ]
Wang, Yifeng [3 ]
Wang, Yingkui [4 ]
Tao, Zhigang [1 ,2 ]
Wan, Liangpeng [3 ]
Xi, Lanyun [5 ]
机构
[1] China Univ Min & Technol Beijing, State Key Lab Geomech & Deep Underground Engn, Beijing 100083, Peoples R China
[2] China Univ Min & Technol Beijing, Sch Mech & Civil Engn, Beijing 100083, Peoples R China
[3] China Three Gorges Projects Dev Co Ltd, Chengdu 610041, Sichuan, Peoples R China
[4] Changjiang Survey Planning Design & Res Co Ltd, Wuhan 430010, Hubei, Peoples R China
[5] Three Gorges High Tech Informat Technol Co Ltd, Beijing 100033, Peoples R China
关键词
ROCK MASS; STABILITY;
D O I
10.1155/2020/3402762
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The high-steep rock slope stability is one of the key technologies in the construction of water conservancy and hydropower projects, which affects and restricts the development of hydraulic resources and the construction of hydropower projects. In this paper, a three-dimensional numerical model was built incorporating stratigraphy, geological structures, and the inverted rock mechanical parameters to perform displacement, stress, and plastic zone analyses for an excavated slope in China using the FLAC3D software. The numerical simulation results after slope excavation show that the deformation near the fault fracture zone is the largest, ranging from 350 mm to 380 mm. The compressive stress is concentrated on the slope foot and the connecting part, the stress value is 2 MPa similar to 5 MPa, there is a large tensile stress area in the slope, and the tensile stress value is 0 MPa similar to 0.4 MPa. The plastic zone of the slope is concentrated near the fault F(6)and the structural influence zone, and the rock mass of the slope basically enters the plastic state. On this basis, the deformation mechanism of slope was analyzed, while the internal and external factors affecting the slope deformation were described in detail. This work would provide an effective reference basis for slope stability evaluation and treatment of similar hydropower stations.
引用
收藏
页数:17
相关论文
共 50 条
  • [21] Rock slope deformation mechanism in the Cihaxia Hydropower Station, Northwest China
    Zhang, Zelin
    Liu, Gao
    Wu, Shuren
    Tang, Huiming
    Wang, Tao
    Li, Gaoyong
    Liang, Changyu
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2015, 74 (03) : 943 - 958
  • [22] Deformation monitoring and analysis of left bank high slope at Jinping I hydropower station
    Huang Zhi-peng
    Dong Yan-jun
    Liao Nian-chun
    Yin Jian-min
    Zhou Jiang-ping
    ROCK AND SOIL MECHANICS, 2012, 33 : 235 - 242
  • [25] The Toppling Deformation and Failure Criteria of a Steep Bedding Rock Slope-The Case of a Bank Slope at the Duonuo Hydropower Station
    Li, Tiantao
    Li, Xuan
    Wei, Kaihong
    Guo, Jian
    Heng, Xi
    Yuan, Jing
    Ran, Weiling
    Pei, Xiangjun
    WATER, 2025, 17 (04)
  • [26] Stability Analysis of a High-Steep Dump Slope under Different Rainfall Conditions
    Li, Shaoling
    Qiu, Chi
    Huang, Jiankun
    Guo, Xiaoping
    Hu, Yucun
    Mugahed, Al-Shami Qahtan
    Tan, Jin
    SUSTAINABILITY, 2022, 14 (18)
  • [27] Stability analysis and reinforcement evaluation of high-steep rock slope by microseismic monitoring
    Ma, K.
    Tang, C. A.
    Liang, Z. Z.
    Zhuang, D. Y.
    Zhang, Q. B.
    ENGINEERING GEOLOGY, 2017, 218 : 22 - 38
  • [28] Stability analysis of completely-strongly weathered high-steep rock slope
    Wang, L.
    Tan, Z. Y.
    Li, Y.
    Li, X. J.
    ROCK MECHANICS: ACHIEVEMENTS AND AMBITIONS, 2012, : 999 - 1005
  • [29] Study on determining method of safe bridge foundation position on high-steep slope
    Zhao, W
    Xie, Q
    Li, Y
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 4, PTS A and B, 2004, 4 : 172 - 176
  • [30] Study on dynamic stability of high-steep loess slope considering the effect of buildings
    Wang, Lili
    Li, Ning
    Wang, Ping
    Wang, Huijuan
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2020, 134