An investment decision model for the optimal placement of phasor measurement units

被引:15
|
作者
Mousavian, Seyedamirabbas [1 ]
Feizollahi, Mohammad Javad [2 ]
机构
[1] Clarkson Univ, Sch Business, Potsdam, NY 13699 USA
[2] Georgia Inst Technol, Sch Ind & Syst Engn, Atlanta, GA 30332 USA
关键词
Phasor measurement unit; Optimal placement; Network observability; Genetic algorithm; OPTIMAL PMU PLACEMENT; POWER-SYSTEM OBSERVABILITY; GENETIC ALGORITHM; MEASUREMENT REDUNDANCY; COMMITMENT PROBLEM; SEARCH;
D O I
10.1016/j.eswa.2015.05.041
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Safe operation and reliability of the electrical power systems necessitate full observability of the power grid. Phasor measurement units (PMUs) are the state-of-the-art intelligent devices that collect synchronized phasors of voltages and currents in real time. It is not economically justifiable to install PMUs at all buses of the power grid. Hence, designing the PMUs network and determining their optimal placement in the power grid is an investment decision. In this paper, we propose a new investment decision model to determine the optimal placement of PMUs that guarantees the full observability of the power grid. Network observability rules are applied to reduce the capital cost of installing PMUs. A problem-specific genetic algorithm is developed to determine the optimal investment decision. The N - 1 reliability requirement of the power grid has been integrated in the model as well to obtain the resilient network design against all single contingencies such as failure of a PMU or a transmission line. Furthermore, a two-phase investment plan is proposed, which provides the power system investors with more flexibility and avoids unnecessary investment costs. In the first phase, PMUs are installed to achieve full observability of the power grid whereas additional PMUs will be installed in the second phase to guarantee the full observability in case of single contingencies. To test the efficacy of the proposed model, experiments are conducted on multiple IEEE test systems with and without considering zero-injection buses. The results are compared to the other methods such as integer linear programming and heuristic methods. The analysis shows that the proposed approach is promising and verifies its efficacy. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:7276 / 7284
页数:9
相关论文
共 50 条
  • [1] A critical review of methods for optimal placement of phasor measurement units
    Johnson, Teena
    Moger, Tukaram
    INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2021, 31 (03)
  • [2] A two-phase investment model for optimal allocation of phasor measurement units considering transmission switching
    Mousavian, Seyedamirabbas
    Valenzuela, Jorge
    Wang, Jianhui
    ELECTRIC POWER SYSTEMS RESEARCH, 2015, 119 : 492 - 498
  • [3] A Literature Review on Optimal Placement of Phasor Measurement Units
    More, K. K.
    Jadhav, H. T.
    2013 INTERNATIONAL CONFERENCE ON POWER, ENERGY AND CONTROL (ICPEC), 2013, : 220 - 224
  • [4] Optimal Placement of Phasor Measurement Units Using Binary Bat Algorithm
    Tawfik, Amr S.
    Abdallah, Emtethal N.
    Youssef, Karim H.
    2017 NINETEENTH INTERNATIONAL MIDDLE-EAST POWER SYSTEMS CONFERENCE (MEPCON), 2017, : 559 - 564
  • [5] Improving observability using optimal placement of phasor measurement units
    Ramachandran, Bhuvana
    Bellarmine, G. Thomas
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2014, 56 : 55 - 63
  • [6] Optimal placement of phasor measurement units for state estimation
    Chakrabarti, Saikat
    Kyriakides, Elias
    PROCEEDINGS OF THE SEVENTH IASTED INTERNATIONAL CONFERENCE ON POWER AND ENERGY SYSTEMS, 2007, : 73 - +
  • [7] Optimal Placement of Phasor Measurement Units for Transmission Grid Observability
    Shafiullah, Md
    Rana, Md Juel
    Alam, Md Shafiul
    Uddin, Muhammad Athar
    2016 INTERNATIONAL CONFERENCE ON INNOVATIONS IN SCIENCE, ENGINEERING AND TECHNOLOGY (ICISET 2016), 2016,
  • [8] Optimal placement of phasor measurement units for power system observability
    Chakrabarti, Saikat
    Kyriakides, Elias
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2008, 23 (03) : 1433 - 1440
  • [9] Optimal placement of phasor measurement units using clustered gravitational search algorithm
    Banumalar, K.
    Manikandan, B., V
    Jeyaraj, K. Arul
    Chandrasekaran, K.
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2018, 34 (06) : 4315 - 4330
  • [10] Optimal placement of phasor measurement units: Particle swarm optimization approach
    Hajian, M.
    Ranjbar, A. M.
    Amraee, Turaj
    Shirani, A. R.
    2007 INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS APPLICATIONS TO POWER SYSTEMS, VOLS 1 AND 2, 2007, : 144 - +