共 50 条
- [26] Optimal order-replacement policy for a deteriorating system based on delayed geometric process Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2015, 49 (08): : 1101 - 1107
- [27] A STOCHASTIC MODEL FOR THE ESTIMATION OF TIME TO SEROCONVERSION OF HIV INFECTED USING GEOMETRIC PROCESS INTERNATIONAL JOURNAL OF AGRICULTURAL AND STATISTICAL SCIENCES, 2008, 4 (02): : 313 - 323
- [29] 2-DIMENSIONAL COMBINATION WARRANTY POLICIES RAIRO-RECHERCHE OPERATIONNELLE-OPERATIONS RESEARCH, 1994, 28 (01): : 57 - 75