共 50 条
- [42] Dynamic programming algorithms and Lagrangian lower bounds for a discrete lot streaming problem in a two-machine flow shop 4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2021, 19 (02): : 265 - 288
- [43] Migrating birds optimization (MBO) algorithm to solve knapsack problem 8TH INTERNATIONAL CONFERENCE ON ADVANCES IN INFORMATION TECHNOLOGY, 2017, 111 : 71 - 76
- [44] An Improved Migrating Birds Optimization for Solving the Multidimensional Knapsack Problem 2017 29TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2017, : 4698 - 4703
- [48] Ant colony optimization for Cuckoo Search algorithm for permutation flow shop scheduling problem SYSTEMS SCIENCE & CONTROL ENGINEERING, 2019, 7 (01): : 20 - 27
- [49] Efficient Constructive procedures for the distributed blocking flow shop scheduling problem 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 92 - 98