共 50 条
- [43] Construction cost control based on PDCA cycle International Journal of Simulation: Systems, Science and Technology, 2016, 17 (37): : 19.1 - 19.8
- [46] Structural Line Shape and Stress Analysis in the Construction of Kaziwan Bridge ADVANCED MANUFACTURING TECHNOLOGY, PTS 1, 2, 2011, 156-157 : 553 - 557
- [47] Research on Machine Learning Prediction algorithm of Financial data based on Stochastic Process Analysis and Evolutionary Algorithm PROCEEDINGS OF 2021 2ND INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND INFORMATION SYSTEMS (ICAIIS '21), 2021,
- [48] Reliability intelligence analysis of concrete arch bridge based on Kriging model and PSOSA hybrid algorithm Artificial Intelligence Review, 2023, 56 : 2667 - 2685
- [49] Simulation and analysis of long-span cable-stayed bridge during construction based on ANSYS ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 1: ENGINEERING COMPUTATION AND FINITE ELEMENT ANALYSIS, 2010, : 341 - 345