Prediction Algorithm of Bridge Construction Cost Based on Regression Analysis

被引:3
|
作者
Yang, Zhongxuan [1 ]
Qiu, Hejia [1 ]
机构
[1] Zhongyuan Univ Technol, Syst & Ind Engn Technol Res Ctr, Zhengzhou 450000, Peoples R China
关键词
Regression analysis; bridge engineering; construction cost; prediction algorithm;
D O I
10.2112/SI103-204.1
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In the prediction of bridge construction cost, the correlation between the variables that affect the construction cost is an important factor that affects the prediction results. In the previous prediction algorithm, there is the problem of low Pearson correlation coefficient. Therefore, the prediction algorithm of bridge construction cost based on regression analysis is designed. According to the structure of the bridge entity and the various costs in the project, the influencing factors of the construction cost of the bridge project are determined, and the determinable coefficients among the influencing factors are calculated by regression analysis, then the predicted value of the construction cost of the bridge project is calculated, and the average relative error method and the mean square deviation ratio method are set to ensure the reliability of the predicted value. The experimental results show that the Pearson correlation coefficient of the designed prediction algorithm based on regression analysis is higher than that of the traditional prediction algorithm, which shows that the algorithm is suitable for practical bridge engineering projects.
引用
收藏
页码:979 / 982
页数:4
相关论文
共 50 条
  • [41] Pipeline compressor station construction cost analysis
    Zhao, Yipeng
    Rui, Zhenhua
    INTERNATIONAL JOURNAL OF OIL GAS AND COAL TECHNOLOGY, 2014, 8 (01) : 41 - 61
  • [42] The development of a construction cost prediction model with improved prediction capacity using the advanced CBR approach
    Koo, ChoongWan
    Hong, TaeHoon
    Hyun, ChangTaek
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (07) : 8597 - 8606
  • [43] Construction cost control based on PDCA cycle
    Jianbing L.
    Jianliang C.
    International Journal of Simulation: Systems, Science and Technology, 2016, 17 (37): : 19.1 - 19.8
  • [44] Forecasting Single Disease Cost of Cataract Based on Multivariable Regression Analysis and Backpropagation Neural Network
    Qing, Fang
    Liu, Chuang
    INQUIRY-THE JOURNAL OF HEALTH CARE ORGANIZATION PROVISION AND FINANCING, 2019, 56
  • [45] Reliability intelligence analysis of concrete arch bridge based on Kriging model and PSOSA hybrid algorithm
    Li, Dengguo
    Ye, Zhouling
    Lu, Pengzhen
    Wu, Ying
    Yang, Liu
    Wang, Jiahao
    ARTIFICIAL INTELLIGENCE REVIEW, 2023, 56 (SUPPL 2) : 2667 - 2685
  • [46] Structural Line Shape and Stress Analysis in the Construction of Kaziwan Bridge
    Ren, Xiang
    ADVANCED MANUFACTURING TECHNOLOGY, PTS 1, 2, 2011, 156-157 : 553 - 557
  • [47] Research on Machine Learning Prediction algorithm of Financial data based on Stochastic Process Analysis and Evolutionary Algorithm
    Liu, Jianzhe
    Liu, Zipei
    PROCEEDINGS OF 2021 2ND INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND INFORMATION SYSTEMS (ICAIIS '21), 2021,
  • [48] Reliability intelligence analysis of concrete arch bridge based on Kriging model and PSOSA hybrid algorithm
    Dengguo Li
    Zhouling Ye
    Pengzhen Lu
    Ying Wu
    Liu Yang
    Jiahao Wang
    Artificial Intelligence Review, 2023, 56 : 2667 - 2685
  • [49] Simulation and analysis of long-span cable-stayed bridge during construction based on ANSYS
    Wu, Fangwen
    Xue, Chengfeng
    ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 1: ENGINEERING COMPUTATION AND FINITE ELEMENT ANALYSIS, 2010, : 341 - 345
  • [50] Using stochastic frontier regression to estimate the construction cost inefficiency of prevailing wage laws
    Duncan, Kevin
    Philips, Peter
    Prus, Mark
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2012, 19 (03) : 320 - +