Research on Support Technology of Long Anchor In Fully- Mechanized Caving Thick Coal Broken Roadway

被引:0
|
作者
Yang Guangrong [1 ]
Li Ji [1 ]
Wang Fei [1 ]
Zhao Xidong [1 ]
机构
[1] China Univ Min & Technol Beijing, Fac Resource & Safety Engn, Beijing 100083, Peoples R China
来源
关键词
Thick coal seam; Fully-mechanized caving roadway; Coal heading; Long anchor;
D O I
10.4028/www.scientific.net/AMR.734-737.809
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The 5204 transport roadway roof displacement encountered during the tunneling and mining is more than 240mm, which severely damaged the shape of the roadway. The anchor cable of the top is pulled off and supporting failure takes place. According to the analysis of the surrounding rock pressure behavior law, the concept of supporting new technology based on the concept of "coordinating role of long bolt - surrounding rock" is brought up. This technology can achieve a reasonable match of the supporting object with the displacement and support strength of the surrounding rock. Based on this concept, FLAC3D numerical simulation analysis, combined with the engineering analogy method, produces the long bolting parameters on the 5402 transport roadway. The industrial test results show that in the mining face, the force state of the long bolt is good. When larger displacement in the roof appears, the long bolt is not pulled off and the support failure does not occurs.It means the long bolt has adapted the large deformation of the roadway roof. The research results can provide a reference for similar mechanized caving roadway supporting.
引用
收藏
页码:809 / 814
页数:6
相关论文
共 50 条
  • [21] Research situation and prospect of fully mechanized mining technology in thick coal seams in China
    Tu Shi-hao
    Yuan Yong
    Yang Zhen
    Ma Xiao-tao
    Wu Qi
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MINING SCIENCE & TECHNOLOGY (ICMST2009), 2009, 1 (01): : 35 - 40
  • [22] The Properties and Influence of Dirt Band During the Fully Mechanized Top Coal Caving in Thick Coal Seams
    Shen Jie
    Pan Weidong
    Lin Li
    Li Xiaomeng
    Fan Lujia
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 414 - 417
  • [23] Intelligent precise control technology of fully mechanized top coal caving face
    Zhang S.
    Zhang X.
    Liu S.
    Xu G.
    Meitan Xuebao/Journal of the China Coal Society, 2020, 45 (06): : 2008 - 2020
  • [24] FIELD EXPERIMENTAL STUDY ON COMPREHENSIVE DUST CONTROL TECHNOLOGY IN FULLY MECHANIZED CAVING FACE OF EXTRA THICK COAL SEAM
    Zhao, Li-Juan
    LI, Ying
    Duan, Hong-Fei
    THERMAL SCIENCE, 2023, 27 (1B): : 679 - 686
  • [25] Theory and its key technology framework of intelligentized fully-mechanized caving mining in extremely thick coal seam
    Yu B.
    Xu G.
    Huang Z.
    Guo J.
    Li Z.
    Li D.
    Wang S.
    Meng E.
    Pan W.
    Niu J.
    Xue J.
    Zhao T.
    Meitan Xuebao/Journal of the China Coal Society, 2019, 44 (01): : 42 - 53
  • [26] Intelligent monitoring technology of coal caving in fully-mechanized caving face based on laser scanning
    Hu, Eryi
    Meitan Kexue Jishu/Coal Science and Technology (Peking), 2022, 50 (02): : 244 - 251
  • [27] Study on the rational width of coal pillars for protecting roadway in fully mechanized top caving mining face
    Zhang, S. J.
    Wang, J. A.
    Wu, H. W.
    Li, F.
    ROCK MECHANICS: ACHIEVEMENTS AND AMBITIONS, 2012, : 719 - 730
  • [28] Relationship between support and surrounding rock of fully mechanized caving face in thick coal seam of kilometer deep mine based on microseismic monitoring technology
    Jiang, Fuxing
    Yin, Yongming
    Zhu, Quanjie
    Wen, Jinglin
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2014, 31 (02): : 167 - 174
  • [29] Mechanism and control strategy of asymmetrical floor heave of coal pillar roadway in fully mechanized caving face
    Jia H.
    Wang L.
    Liu S.
    Peng B.
    Zhang W.
    Fan K.
    Meitan Xuebao/Journal of the China Coal Society, 2019, 44 (04): : 1030 - 1040
  • [30] Study on Numerical Simulation of Optimization of the Width of Coal Pillar in Caving Roadway at Fully-Mechanized Caving Face of Deep Mine
    Gao Mingtao
    Zhou Ming
    PROCEEDINGS OF 2015 INTERNATIONAL SYMPOSIUM - SAFETY AND HIGH EFFICIENCY MINING IN COAL, 2015, : 63 - 70