Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juarez Mexico

被引:2
作者
Ferreira Garcia, Karen Y. [1 ]
de la Riva Rodriguez, Jorge [1 ]
Sanchez Leal, Jaime [1 ]
Reyes-Martinez, Rosa M. [1 ]
Woocay Prieto, Arturo [1 ]
机构
[1] Inst Tecnol Ciudad Juarez, Tecnol Nacl Mexico, Div Postgrad Studies & Res, Ciudad Juarez 32500, Mexico
来源
JOURNAL OF ENGINEERING | 2019年 / 2019卷
关键词
D O I
10.1155/2019/1316734
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We propose a methodology for determination of Allowance Time (AT), based on heart rate and work sampling of a production line composed of thirteen stations operated by four workers. The current production line presents a high rate of personnel turnover and absenteeism and with an AT value established by the company of 6.3%. The AT determination is of critical importance, given that through this the workers need to maintain their work rhythm at 100% during the entire workday without fatigue. The resulting allowance after the study was 15% instead of 6.3%, increasing the standard time and causing a decrease in personnel turnover and absenteeism and consequently increasing the production capacity and the reduction of costs.
引用
收藏
页数:6
相关论文
共 23 条
  • [1] Astrand P.O., 2003, TXB WORK PHYSL PHYSL
  • [2] Work fatigue and physiological symptoms in different occupations of high-elevation construction workers
    Chang, Fu-Lin
    Sun, Yih-Min
    Chuang, Kao-Hsing
    Hsu, Der-Jen
    [J]. APPLIED ERGONOMICS, 2009, 40 (04) : 591 - 596
  • [3] Methodology to determine time allowance by work sampling using heart rate
    de la Riva, J.
    Garcia, A. I.
    Reyes, R. M.
    Woocay, A.
    [J]. 6TH INTERNATIONAL CONFERENCE ON APPLIED HUMAN FACTORS AND ERGONOMICS (AHFE 2015) AND THE AFFILIATED CONFERENCES, AHFE 2015, 2015, 3 : 6490 - 6497
  • [4] The analysis of personal and delay allowances using work sampling technique in the sewing room of a clothing manufacturer
    Gunesoglu, Sinem
    Meric, Binnaz
    [J]. INTERNATIONAL JOURNAL OF CLOTHING SCIENCE AND TECHNOLOGY, 2007, 19 (1-2) : 145 - 150
  • [5] Hajikazemi S, 2017, INT J PRODUCT PERFOR, V66, P539, DOI 10.1108/IJPPM-06-2016-0122
  • [6] Kroemer K.H.E., 2000, Ergonomics: How to Design for Ease and Efficiency, V2nd
  • [7] WORK SAMPLING CAN PREDICT UNIT RATE PRODUCTIVITY
    LIOU, FS
    BORCHERDING, JD
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1986, 112 (01): : 90 - 103
  • [8] Work sampling for the production development: A case study of a supplier in European automotive industry
    Martinec, T.
    Skec, S.
    Savsek, T.
    Perisic, M. M.
    [J]. ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2017, 12 (04): : 375 - 387
  • [9] Mital A., 1991, International Journal of International Ergonomics, V8, P165, DOI [10.1016/0169-8141(91)90017-G, DOI 10.1016/0169-8141(91)90017-G]
  • [10] CALCULATING RELAXATION ALLOWANCES FOR CONSTRUCTION OPERATIVES .2. LOCAL MUSCLE FATIGUE
    PRICE, ADF
    [J]. APPLIED ERGONOMICS, 1990, 21 (04) : 318 - 324