A mixed integer program for cyclic scheduling of flexible flow lines

被引:10
作者
Sawik, T. [1 ]
机构
[1] AGH Univ Sci & Technol, Dept Operat Res & Informat Technol, PL-30059 Krakow, Poland
关键词
flexible flow line; cyclic scheduling; cyclic-batch scheduling; mixed integer programming; TIME;
D O I
10.2478/bpasts-2014-0014
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A new mixed integer programming formulation is presented for cyclic scheduling in flow lines with parallel machines and finite in-process buffers, where a Minimal Part Set (MPS) in the same proportion as the overall production target is repetitively scheduled. The cycle of parts in an MPS is not determined a priori, but is obtained along with the optimal schedule for all parts. In addition to the cyclic scheduling, a cyclic-batch scheduling mode is introduced, where within the MPS the parts of one type are processed consecutively. Numerical examples are included and some results of computational experiments are reported.
引用
收藏
页码:121 / 128
页数:8
相关论文
共 12 条
[1]  
Karabati S, 1996, NAV RES LOG, V43, P211, DOI 10.1002/(SICI)1520-6750(199603)43:2<211::AID-NAV4>3.0.CO
[2]  
2-D
[3]   A review of exact solution methods for the non-preemptive multiprocessor flowshop problem [J].
Kis, T ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 164 (03) :592-608
[4]   Cyclic scheduling in synchronous production lines [J].
Kouvelis, P ;
Karabati, S .
IIE TRANSACTIONS, 1999, 31 (08) :709-719
[5]   Complexity of cyclic scheduling problems: A state-of-the-art survey [J].
Levner, Eugene ;
Kats, Vladimir ;
Alcaide Lopez de Pablo, David ;
Cheng, T. C. E. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 59 (02) :352-361
[7]   SEQUENCING IN AN ASSEMBLY LINE WITH BLOCKING TO MINIMIZE CYCLE TIME [J].
MCCORMICK, ST ;
PINEDO, ML ;
SHENKER, S ;
WOLF, B .
OPERATIONS RESEARCH, 1989, 37 (06) :925-935
[8]   Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective [J].
Ribas, Imma ;
Leisten, Rainer ;
Framinan, Jose M. .
COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (08) :1439-1454
[9]   Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers [J].
Sawik, T .
MATHEMATICAL AND COMPUTER MODELLING, 2000, 31 (13) :39-52
[10]   Mixed integer programming for scheduling surface mount technology lines [J].
Sawik, T .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (14) :3219-3235