Integration of VR with BIM to facilitate real-time creation of bill of quantities during the design phase: a proof of concept study

被引:30
作者
Davidson, Jordan [1 ]
Fowler, John [1 ]
Pantazis, Charalampos [1 ]
Sannino, Massimo [1 ]
Walker, Jordan [1 ]
Sheikhkhoshkar, Moslem [2 ]
Rahimian, Farzad Pour [2 ]
机构
[1] Univ Strathclyde, Dept Architecture, Glasgow G1 1XJ, Lanark, Scotland
[2] Northumbria Univ, Fac Engn & Environm, Dept Mech & Construct Engn, Newcastle NE1 8ST, England
关键词
virtual reality; bill of quantities; BIM; Revit; real-time synchronisation; VIRTUAL-REALITY; VISUALIZATION; INFORMATION;
D O I
10.1007/s42524-019-0039-y
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
As building practices change, procedures that seemed indispensable at one point can be abandoned for others, one example of which is the bill of quantities (B/Q). Research into the extant literature attributes the declining use of B/Qs to a multitude of reasons, such as its complexity, the potentially long time required to produce it, the growth in popularity of non-traditional procurement systems, and the challenge of using the information within the document in a construction schedule. With these issues in mind, building information modeling (BIM) and virtual reality (VR) are combined and proposed as a potential solution that allows inclusion of the client into the design process. Following a literature review and precedent study, an experiment was carried out using this new process to simulate a client's design decisions on window and interior furnishings. The choices made by the client using VR automatically updated a B/Q schedule built in Revit and allowed them to have a firm understanding of project costs. Besides giving the client more confidence in a pleasing final outcome, the technology also ensured an up-to-date, accurate, and easily understandable B/Q. The proposed method features great potential savings in cost and time and gives the B/Q a newfound importance in future construction processes. The research case presented in this paper is a stepping stone in exploring new opportunities offered by VR and BIM and how they could improve the reliability and accuracy of traditional procurement within construction, specifically within the B/Q document.
引用
收藏
页码:396 / 403
页数:8
相关论文
共 29 条
[1]  
Agency D, 2018, IKEA VIRT REAL SHOWR
[2]  
Bandi S, 2014, INT J BUILT ENV SUST, V1, P63
[3]  
Bille Ross, 2014, EXTENDING BUILDING I
[4]   Visualisation in architecture, engineering and construction (AEC) [J].
Bouchlaghem, D ;
Shang, HP ;
Whyte, J ;
Ganah, A .
AUTOMATION IN CONSTRUCTION, 2005, 14 (03) :287-295
[5]  
Chen S E, 1995, NAVIGATION, P29
[6]  
Corke C, 2017, AEC MAGAZINE TECHNOL
[7]   Bills of Quantities: nemesis or nirvana? [J].
Davis, Peter R. ;
Love, Peter E.D. ;
Baccarini, David .
Structural Survey, 2009, 27 (02) :99-108
[8]  
Donalek C, 2014, IEEE INT CONF BIG DA, P609, DOI 10.1109/BigData.2014.7004282
[9]   Zero latency: Real-time synchronization of BIM data in virtual reality for collaborative decision-making [J].
Du, Jing ;
Zou, Zhengbo ;
Shi, Yangming ;
Zhao, Dong .
AUTOMATION IN CONSTRUCTION, 2018, 85 :51-64
[10]  
JELD-WEN, 2000, INT EXT DOORS WIND P