Construction Optimization of the Bridge-Tunnel Sections

被引:0
|
作者
Chao, Wan-li [1 ]
Wang, Xing-hua [1 ]
机构
[1] Cent S Univ, Sch Civil & Architectural Engn, Changsha 410075, Hunan, Peoples R China
来源
FRONTIERS OF ADVANCED MATERIALS AND ENGINEERING TECHNOLOGY, PTS 1-3 | 2012年 / 430-432卷
关键词
bridge-tunnel sections; construction optimization; numerical simulation;
D O I
10.4028/www.scientific.net/AMR.430-432.408
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The construction method of the joint section connecting bridge and tunnel was simulated by FEM. After Calculating and comparing the result of stresses and effect of displacement-control in the surrounding rock under three methods of construction, it shown that the side heading method was very advantageous for the stress concentration, and the CRD method provided a good control of bottom heave, as for the top heave, the double side heading method was more favorable. From the dynamic analysis, the vehicle load is found to have, though small, wide influence. What's more, the lapping distance between the bridge and tunnel is better more than 4m, and the influence from the high running speed should be paid attention to.
引用
收藏
页码:408 / 413
页数:6
相关论文
共 50 条
  • [31] Research on prediction of surrounding rock deformation and optimization of construction parameters of high ground stress tunnel based on WOA-LSTM
    Yao, Jianquan
    Nie, Jiajia
    Li, Chaofeng
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [32] Comparison of ventilation methods used during tunnel construction
    Chang, Xiaoke
    Chai, Junrui
    Liu, Zhao
    Qin, Yuan
    Xu, Zengguang
    ENGINEERING APPLICATIONS OF COMPUTATIONAL FLUID MECHANICS, 2020, 14 (01) : 107 - 121
  • [33] Field Monitoring of Surrounding Rock Stress in Tunnel Construction
    Dong, Yingna
    Huang, Qiang
    PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 1735 - 1739
  • [34] Simulation-Based Optimization of Crane Lifting Position and Capacity Using a Construction Digital Twin for Prefabricated Bridge Deck Assembly
    Jang, Dae-Ho
    Roh, Gi-Tae
    Jeon, Chi-Ho
    Shim, Chang-Su
    BUILDINGS, 2025, 15 (03)
  • [35] Analysis on the Influence of Cross Tunnel Construction on the Deformation of the Existing High-Speed Railway Tunnel
    Pan W.
    Gao Z.
    Zheng C.
    Gong Z.
    Geotechnical and Geological Engineering, 2018, 36 (6) : 4001 - 4013
  • [36] Study on Influence of Shallow Buried Tunnel Excavation on Adjacent Bridge Piles
    Yuanxin Miao
    Meng Guo
    Xuesong Zhao
    Huan Liu
    Cunwei Hou
    Meng Zhao
    Yao Li
    Geotechnical and Geological Engineering, 2023, 41 : 3321 - 3333
  • [37] Research on Optimization of Excavating Seguence for Dawangou Tunnel
    Jin Changyu
    Zhao Panpan
    Xiang Chunfu
    Xia Zifeng
    Dong Longbin
    Liu Dong
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 3703 - +
  • [38] Study on Influence of Shallow Buried Tunnel Excavation on Adjacent Bridge Piles
    Miao, Yuanxin
    Guo, Meng
    Zhao, Xuesong
    Liu, Huan
    Hou, Cunwei
    Zhao, Meng
    Li, Yao
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2023, 41 (06) : 3321 - 3333
  • [39] MULTIOBJECTIVE PROCESS OPTIMIZATION FOR CONSTRUCTION
    CHANG, P
    BERNOLD, L
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1992, 19 (01) : 129 - 136
  • [40] Static aerodynamic force coefficients for an arch bridge girder with two cross sections
    Guo, Jian
    Zhu, Minjun
    WIND AND STRUCTURES, 2020, 31 (03) : 209 - 216