Construction Optimization of the Bridge-Tunnel Sections

被引:0
|
作者
Chao, Wan-li [1 ]
Wang, Xing-hua [1 ]
机构
[1] Cent S Univ, Sch Civil & Architectural Engn, Changsha 410075, Hunan, Peoples R China
来源
FRONTIERS OF ADVANCED MATERIALS AND ENGINEERING TECHNOLOGY, PTS 1-3 | 2012年 / 430-432卷
关键词
bridge-tunnel sections; construction optimization; numerical simulation;
D O I
10.4028/www.scientific.net/AMR.430-432.408
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The construction method of the joint section connecting bridge and tunnel was simulated by FEM. After Calculating and comparing the result of stresses and effect of displacement-control in the surrounding rock under three methods of construction, it shown that the side heading method was very advantageous for the stress concentration, and the CRD method provided a good control of bottom heave, as for the top heave, the double side heading method was more favorable. From the dynamic analysis, the vehicle load is found to have, though small, wide influence. What's more, the lapping distance between the bridge and tunnel is better more than 4m, and the influence from the high running speed should be paid attention to.
引用
收藏
页码:408 / 413
页数:6
相关论文
共 50 条
  • [21] Soil Deformation Induced by Underground Tunnel Construction
    Wang, L.
    Liu, R.
    Wang, G. G.
    GEOTECHNICAL ENGINEERING, 2015, 46 (03): : 82 - 88
  • [22] Numerical simulation for settlement urban tunnel construction
    WANG Qingsong
    YU Qingyang
    Global Geology, 2014, 17 (03) : 170 - 175
  • [23] Parameter Optimization on the Forced Ventilation of Symmetric Tunnel Construction Based on the Super-Short Bench-Cut Method
    Niu, Xiaokai
    Zhang, Dingli
    Su, Jie
    Guo, Hong
    SYMMETRY-BASEL, 2018, 10 (02):
  • [24] Optimization of Reasonable Interval of Parallel Tunnel
    Guo, Li
    Li, Hongfang
    PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 1550 - 1553
  • [25] Numerical Analysis of Vibration Response of Bridge and Tunnel Transition Section
    Zuo Zhuo
    Zhang Jianren
    Fu Helin
    Peng Wenxuan
    ELECTRONIC JOURNAL OF GEOTECHNICAL ENGINEERING, 2019, 24 (01): : 269 - 278
  • [26] Deformation and Reinforcement of the Existing Tunnel Affected by New Shield Tunnel Construction with Small Clearance
    Zhang, Junchao
    Yu, Jiacheng
    Li, Cunjun
    Liu, Yizhou
    Tian, Longgang
    He, Yonglin
    Zhang, Qi
    BUILDINGS, 2025, 15 (02)
  • [27] Construction Mechanics of In-situ Expansion of the Intersection of Existing Tunnel Shaft and Main Tunnel
    Zhao W.
    Wang X.
    Bai Q.
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2021, 42 (05): : 713 - 719
  • [28] The Comparison of Tunnel Engineering Construction Methods ForRenhechang Tunnel Crossing Underneath Existing Tunnel On Lanzhou-Chongqing Railway
    Sui, Chuanyi
    Zhou, Xudong
    Wang, Linhui
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 1330 - 1333
  • [29] Experimental and numerical identification of flutter derivatives for nine bridge deck sections
    Starossek, Uwe
    Aslan, Hasan
    Thiesemann, Lydia
    WIND AND STRUCTURES, 2009, 12 (06) : 519 - 540
  • [30] Experimental and numerical identification of flutter derivatives for nine bridge deck sections
    Hamburg University of Technology, 21073 Hamburg, Germany
    不详
    Wind Struct Int J, 2009, 6 (519-540): : 519 - 540