共 50 条
- [3] Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time Annals of Operations Research, 2010, 180 : 165 - 196
- [7] A hybrid multi-objective evolutionary algorithm approach for handling sequence- and machine-dependent set-up times in unrelated parallel machine scheduling problem SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2017, 42 (03): : 391 - 403