Medium-term Rail Planning at Rio Tinto Iron Ore

被引:0
作者
Garcia-Flores, R. [1 ]
Singh, G. [1 ]
Ernst, A. [1 ]
Welgama, P. [2 ]
机构
[1] CSIRO Math Informat & Stat, Private Bag 33, Clayton, Vic 3169, Australia
[2] Rio Tinto Tech Serv, Perth, WA 6837, Australia
来源
19TH INTERNATIONAL CONGRESS ON MODELLING AND SIMULATION (MODSIM2011) | 2011年
关键词
Scheduling; Rail planning; Medium-term planning; Blending; Mixed-integer non-linear programming; OPERATIONS; MODEL;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In minerals supply chains, medium term plans over time horizons from two weeks to two years are used not only to maximise throughput and identify bottlenecks, but also for scheduling crews, production and maintenance. These plans need to observe constraints like maintenance and production requirements, fleet capacities, and dumping, loading and stockyard management at every site. Additionally, the iron ore supply chains considered in this paper also needs to deal with grade quality constraints. This introduces extra complexities in terms of non-linear constraints as the quality depends on the mixing ratio of ore from different sources. We present an optimisation tool that was developed for Rio Tinto Iron Ore for such planning. The tool provides optimal number of trains while taking into account all the system constraints and has already reduced total planning time significantly.
引用
收藏
页码:311 / 317
页数:7
相关论文
共 6 条
[1]   A mixed-integer linear programming model for bulk grain blending and shipping [J].
Bilgen, Bilge ;
Ozkarahan, Irem .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 107 (02) :555-571
[2]  
Fishman H, 2005, AUSTRALAS I MIN MET, V2005, P95
[3]   Medium-term pricing and operations planning in intermodal transportation [J].
Li, L ;
Tayur, S .
TRANSPORTATION SCIENCE, 2005, 39 (01) :73-86
[4]   A MIXED-INTEGER LINEAR PROGRAMMING (MILP) MODEL FOR SHORT-RANGE PRODUCTION SCHEDULING OF CEMENT QUARRY OPERATIONS [J].
Rehman, Safi Ur ;
Asad, Mohammad Waqar Ali .
ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2010, 27 (03) :315-333
[5]   INTEGRATING OPTIMIZATION AND SIMULATION - A COMPARISON OF TWO CASE STUDIES IN MINE PLANNING [J].
Sandeman, Tom ;
Fricke, Chris ;
Bodon, Peter ;
Stanford, Chris .
PROCEEDINGS OF THE 2010 WINTER SIMULATION CONFERENCE, 2010, :1898-1910
[6]   Tactical planning of offshore petroleum production [J].
Ulstein, Nina Linn ;
Nygreen, Bjorn ;
Sagli, Jan Richard .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 176 (01) :550-564