A Risk-Based Approach to Multi-Stage Probabilistic Transmission Network Planning

被引:35
作者
Qiu, Jing [1 ]
Dong, Zhao Yang [2 ,3 ]
Zhao, Junhua [4 ]
Xu, Yan [3 ]
Luo, Fengji [1 ]
Yang, Jiajia [1 ]
机构
[1] Univ Newcastle, Ctr Intelligent Elect Networks, Callaghan, NSW 2308, Australia
[2] CSG, Elect Power Res Inst, Guangzhou 510080, Guangdong, Peoples R China
[3] Univ Sydney, Sch Elect & Informat Engn, Sydney, NSW, Australia
[4] Chinese Univ Hong Kong Shenzhen, Shenzhen, Guangdong, Peoples R China
基金
中国国家自然科学基金;
关键词
Power system planning; probability; capped load curtailment probability; risk management; POINT ESTIMATE METHOD; OPTIMAL POWER-FLOW; WIND POWER; EXPANSION; SYSTEMS; MODEL; GENERATION; LOSSES;
D O I
10.1109/TPWRS.2015.2506200
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
As a result of the power industry restructuring and the increasing integration of large-scale renewable energy, power transmission expansion planning (TEP) has become a complicated decision-making process requiring risk analysis. This paper proposes a chance constrained approach to TEP. The probabilistic load curtailment degree is quantified by a capped load curtailment probability, which is incorporated into our multi-stage TEP model. Moreover, the system dynamic performance including security and stability is also realistically considered in our model through an iterative procedure. To enhance the computational efficiency, probabilistic optimal power flow (POPF) is adopted in conjunction with an evolutionary algorithm (EA). In case studies, different TEP approaches are compared, and effects of different parameter settings are also investigated. According to the simulation results, our model can not only provide information regarding risks, but also help network planners make trade-offs to select the most flexible and cost-effective planning schemes.
引用
收藏
页码:4867 / 4876
页数:10
相关论文
共 31 条
[1]   Application of a Joint Deterministic-Probabilistic Criterion to Wind Integrated Bulk Power System Planning [J].
Billinton, Roy ;
Gao, Yi ;
Karki, Rajesh .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2010, 25 (03) :1384-1392
[2]  
Castillo Enrique., 2002, BUILDING SOLVING MAT
[3]   A method for transmission system expansion planning considering probabilistic reliability criteria [J].
Choi, J ;
Tran, T ;
El-Keib, ARA ;
Thomas, R ;
Oh, S ;
Billinton, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (03) :1606-1615
[4]   A fuzzy branch and bound-based transmission system expansion planning for the highest satisfaction level of the decision maker [J].
Choi, J ;
El-Keib, AA ;
Tran, T .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (01) :476-484
[5]   Transmission network expansion planning under an improved genetic algorithm [J].
da Silva, EL ;
Gil, HA ;
Areiza, JM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (03) :1168-1175
[6]   Multistage and coordinated planning of the expansion of transmission systems [J].
Escobar, AH ;
Gallego, RA ;
Romero, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (02) :735-744
[7]   Energy Storage Application for Performance Enhancement of Wind Integration [J].
Ghofrani, M. ;
Arabali, A. ;
Etezadi-Amoli, M. ;
Fadali, M. S. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (04) :4803-4811
[8]   An efficient point estimate method for probabilistic analysis [J].
Hong, HP .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 1998, 59 (03) :261-267
[9]   Transmission Network Planning Under Security and Environmental Constraints [J].
Kazerooni, Ali Khajeh ;
Mutale, Joseph .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2010, 25 (02) :1169-1178
[10]   Coordination of Short-Term Operation Constraints in Multi-Area Expansion Planning [J].
Khodaei, Amin ;
Shahidehpour, Mohammad ;
Wu, Lei ;
Li, Zuyi .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (04) :2242-2250