Risk Assessment of Optimal Sidetrack Time

被引:1
|
作者
Orodu, O. D. [1 ]
Ako, C. T. [1 ]
Craig, A. J. [1 ]
机构
[1] Covenant Univ, Dept Petr Engn, Ota, Ogun State, Nigeria
关键词
Monte-Carlo; optimization; risk assessment; sidetrack; water-flooding;
D O I
10.1080/10916466.2010.549888
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Optimal time of sidetrack is evaluated considering the uncertainties of reservoir variables as it affects production performance and economics based on the uncertainty associated with the sidetrack operation. Analytical production performance schemes are applied to study scenarios of production under natural decline and water-flood recovery using Monte Carlo simulation. Caution should be exercised on assumptions made to simplify the objective function, as it may not truly represent subsurface flow. Full evaluation of sensitivity of time to reservoir variables is possible using a proxy-model based on experimental design due to the complex physical phenomenon of subsurface flow.
引用
收藏
页码:1585 / 1594
页数:10
相关论文
共 50 条
  • [41] Modeling travel time reliability of freeways using risk assessment techniques
    Tu, Huizhao
    Li, Hao
    van Lint, Hans
    van Zuylen, Henk
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2012, 46 (10) : 1528 - 1540
  • [42] Operational Risk Reverse Stress Testing: Optimal Solutions
    Mitic, Peter
    MATHEMATICAL AND COMPUTATIONAL APPLICATIONS, 2021, 26 (02)
  • [43] Probability concepts in ecological risk assessment
    Power, M
    HUMAN AND ECOLOGICAL RISK ASSESSMENT, 1996, 2 (04): : 650 - 654
  • [44] Real-Time COVID-19 Infection Risk Assessment and Mitigation based on Public-Domain Data
    Cheng, Albert M. K.
    PROCEEDINGS OF URGENTHPC 2021: THE THIRD INTERNATIONAL WORKSHOP ON HPC FOR URGENT DECISION MAKING, 2021, : 29 - 35
  • [45] Modelling BSE trend over time in Europe, a risk assessment perspective
    Christian Ducrot
    Carole Sala
    Giuseppe Ru
    Aline de Koeijer
    Hazel Sheridan
    Claude Saegerman
    Thomas Selhorst
    Mark Arnold
    Miroslaw P. Polak
    Didier Calavas
    European Journal of Epidemiology, 2010, 25 : 411 - 419
  • [46] Climate input parameters for real-time online risk assessment
    Richard Petritsch
    Hubert Hasenauer
    Natural Hazards, 2014, 70 : 1749 - 1762
  • [47] Study on Risk Assessment of Tunnel Engineering Based on The Time-reliability
    Jia Jianqing
    Lai Yuanming
    Li Yuwei
    Wang Hongtu
    DISASTER ADVANCES, 2012, 5 (04): : 774 - 778
  • [48] Optimal Inventory Model with Time and Price Dependent Demand Under the Risk of Product Obsolescence
    Bajegani H.Z.
    Gholamian M.R.
    International Journal of Applied and Computational Mathematics, 2022, 8 (1)
  • [49] Challenges in risk assessment: quantitative risk assessment
    Jacxsens, Liesbeth
    Uyttendaele, Mieke
    De Meulenaer, Bruno
    INTERNATIONAL CONFERENCE OF SABARAGAMUWA UNIVERSITY OF SRI LANKA 2015 (ICSUSL 2015), 2016, 6 : 23 - 30
  • [50] Risk Assessment of Power Supply Security Considering Optimal Load Shedding in Extreme Precipitation Scenarios
    Zhou, Gang
    Shi, Jianxun
    Chen, Bingjing
    Qi, Zhongyi
    Wang, Licheng
    ENERGIES, 2023, 16 (18)