Risk Assessment of Optimal Sidetrack Time

被引:1
|
作者
Orodu, O. D. [1 ]
Ako, C. T. [1 ]
Craig, A. J. [1 ]
机构
[1] Covenant Univ, Dept Petr Engn, Ota, Ogun State, Nigeria
关键词
Monte-Carlo; optimization; risk assessment; sidetrack; water-flooding;
D O I
10.1080/10916466.2010.549888
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Optimal time of sidetrack is evaluated considering the uncertainties of reservoir variables as it affects production performance and economics based on the uncertainty associated with the sidetrack operation. Analytical production performance schemes are applied to study scenarios of production under natural decline and water-flood recovery using Monte Carlo simulation. Caution should be exercised on assumptions made to simplify the objective function, as it may not truly represent subsurface flow. Full evaluation of sensitivity of time to reservoir variables is possible using a proxy-model based on experimental design due to the complex physical phenomenon of subsurface flow.
引用
收藏
页码:1585 / 1594
页数:10
相关论文
共 50 条
  • [31] Optimal design of a new water distribution network using a water supply risk assessment
    Choi, Taeho
    Bae, Cheolho
    Shin, Hwisu
    Koo, Jayong
    DESALINATION AND WATER TREATMENT, 2017, 65 : 153 - 162
  • [32] OPTIMAL OFF POINT DETERMINATION IN ELECTRICAL POWER DISTRIBUTION SYSTEM USING RISK ASSESSMENT
    Abdullah, Ahmad Zaidi
    Hanafi, Noor Hasnizam
    Azizan, Nurhafiza
    Amlus, Mohammad Harith
    JURNAL TEKNOLOGI, 2016, 78 (6-2): : 15 - 17
  • [33] Real-time automated risk assessment in protected core networking
    Konrad Wrona
    Geir Hallingstad
    Telecommunication Systems, 2010, 45 : 205 - 214
  • [34] Modelling BSE trend over time in Europe, a risk assessment perspective
    Ducrot, Christian
    Sala, Carole
    Ru, Giuseppe
    de Koeijer, Aline
    Sheridan, Hazel
    Saegerman, Claude
    Selhorst, Thomas
    Arnold, Mark
    Polak, Miroslaw P.
    Calavas, Didier
    EUROPEAN JOURNAL OF EPIDEMIOLOGY, 2010, 25 (06) : 411 - 419
  • [35] Run-time threat models for systematic and continuous risk assessment
    Verreydt, Stef
    Van Landuyt, Dimitri
    Joosen, Wouter
    SOFTWARE AND SYSTEMS MODELING, 2024,
  • [36] Risk assessment in mental health: Staff attitudes and an estimate of time cost
    Hawley, Chris J.
    Gale, Tim M.
    Sivakumaran, Thanusha
    Littlechild, Brian
    JOURNAL OF MENTAL HEALTH, 2010, 19 (01) : 88 - 98
  • [37] Climate input parameters for real-time online risk assessment
    Petritsch, Richard
    Hasenauer, Hubert
    NATURAL HAZARDS, 2014, 70 (03) : 1749 - 1762
  • [38] Real-time automated risk assessment in protected core networking
    Wrona, Konrad
    Hallingstad, Geir
    TELECOMMUNICATION SYSTEMS, 2010, 45 (2-3) : 205 - 214
  • [39] Application of Real-time Risk Assessment Method in Dispatching Operation
    Liu, Yan
    Song, Yingwei
    Zhao, Dewei
    Zhao, Lin
    Zeng, Yuan
    Zhao, Cong
    ENERGY DEVELOPMENT, PTS 1-4, 2014, 860-863 : 2095 - +
  • [40] A Real-Time Risk Assessment Model for Intrusion Detection Systems
    Chakir, El Mostapha
    Moughit, Mohamed
    Idrissi Khamlichi, Youness
    2017 INTERNATIONAL SYMPOSIUM ON NETWORKS, COMPUTERS AND COMMUNICATIONS (ISNCC), 2017,