Risk Assessment of Optimal Sidetrack Time

被引:1
|
作者
Orodu, O. D. [1 ]
Ako, C. T. [1 ]
Craig, A. J. [1 ]
机构
[1] Covenant Univ, Dept Petr Engn, Ota, Ogun State, Nigeria
关键词
Monte-Carlo; optimization; risk assessment; sidetrack; water-flooding;
D O I
10.1080/10916466.2010.549888
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Optimal time of sidetrack is evaluated considering the uncertainties of reservoir variables as it affects production performance and economics based on the uncertainty associated with the sidetrack operation. Analytical production performance schemes are applied to study scenarios of production under natural decline and water-flood recovery using Monte Carlo simulation. Caution should be exercised on assumptions made to simplify the objective function, as it may not truly represent subsurface flow. Full evaluation of sensitivity of time to reservoir variables is possible using a proxy-model based on experimental design due to the complex physical phenomenon of subsurface flow.
引用
收藏
页码:1585 / 1594
页数:10
相关论文
共 50 条
  • [1] Sidetrack and recompletion risk evaluation - Waterflooded reservoir
    Orodu, Oyinkepreye David
    Tang, Zhonghua
    Anawe, Paul A. L.
    JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2011, 78 (3-4) : 705 - 718
  • [2] Risk evaluation for production-injection recompletion and sidetrack
    Orodu, Oyinkepreye D.
    Tang, Zhonghua
    ENERGY EXPLORATION & EXPLOITATION, 2011, 29 (03) : 235 - 249
  • [3] Optimal temporal risk assessment
    Balci, Fuat
    Freestone, David
    Simen, Patrick
    deSouza, Laura
    Cohen, Jonathan D.
    Holmes, Philip
    FRONTIERS IN INTEGRATIVE NEUROSCIENCE, 2011, 5
  • [4] Optimal risk regulation of monopolists with subjective risk assessment
    Kishishita, Daiki
    Sato, Susumu
    JOURNAL OF REGULATORY ECONOMICS, 2021, 59 (03) : 251 - 279
  • [5] Optimal risk regulation of monopolists with subjective risk assessment
    Daiki Kishishita
    Susumu Sato
    Journal of Regulatory Economics, 2021, 59 : 251 - 279
  • [6] Time capsule for landslide risk assessment
    Lei, Yu
    Huang, Jinsong
    Cui, Yifei
    Jiang, Shui-Hua
    Wu, Shengnan
    Ching, Jianye
    GEORISK-ASSESSMENT AND MANAGEMENT OF RISK FOR ENGINEERED SYSTEMS AND GEOHAZARDS, 2023, 17 (04) : 613 - 634
  • [7] An Optimal Scheduling Dispatch of a Microgrid under Risk Assessment
    Lin, Whei-Min
    Yang, Chung-Yuen
    Tu, Chia-Sheng
    Tsai, Ming-Tang
    ENERGIES, 2018, 11 (06):
  • [8] A framework for risk assessment and optimal line upgrade selection to mitigate wildfire risk
    Taylor, Sofia
    Roald, Line A.
    ELECTRIC POWER SYSTEMS RESEARCH, 2022, 213
  • [9] Optimal discretization for geographical detectors-based risk assessment
    Cao, Feng
    Ge, Yong
    Wang, Jin-Feng
    GISCIENCE & REMOTE SENSING, 2013, 50 (01) : 78 - 92
  • [10] An Optimal Phase Arrangement of Distribution Transformers under Risk Assessment
    Tu, Chia-Sheng
    Yang, Chung-Yuen
    Tsai, Ming-Tang
    ENERGIES, 2020, 13 (21)