Soil disturbance induced by EPB shield tunnelling in multilayered ground with soft sand lying on hard rock: A model test and DEM study

被引:31
作者
Wang, Jun [1 ,2 ]
Feng, Kun [1 ]
Wang, Yunchao [1 ]
Lin, Guojin [2 ]
He, Chuan [1 ]
机构
[1] Southwest Jiaotong Univ, Key Lab Transportat Tunnel Engn, Minist Educ, Chengdu 610031, Peoples R China
[2] Sichuan Highway Planning Survey Design & Res Inst, Chengdu 610041, Peoples R China
基金
中国国家自然科学基金;
关键词
EPB shield tunnel; Multilayered ground; Soil disturbance; Over excavation; Laboratory test; Discrete element method (DEM); NUMERICAL-MODEL; FACE STABILITY; SETTLEMENT;
D O I
10.1016/j.tust.2022.104738
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A large scale model test and numerical simulation using three dimensional discrete element method (3D DEM) were carried out in parallel to study the soil disturbance induced by earth pressure balanced (EPB) shield tunnelling in multilayered ground with soft sand lying on hard rock. The model test used a miniature EPB shield machine which could fully reproduce the real tunnel construction of excavation and support. The DEM model simulating the model test was developed to capture the microscopic mechanisms of ground deformation. The surface and subsurface settlement were closely recorded in model test and compared with those of homogeneous ground to clarify the influence of underlying rock on the movement of overlying sand. The volume ratio of rock to sand in excavated muck was closely recorded in DEM simulation to quantitatively analyse the over excavation of soft sand. Results show that both the surface and subsurface settlement trough in multilayered ground are narrower than those in homogeneous ground, while the subsurface settlement in multilayered ground is larger than that in homogeneous ground. The width parameter of settlement trough decreases nonlinearly along the gravitational direction. The over excavation of overlying soft sand is influenced by the ratio of hard rock to tunnel cross section and the rotating speed of shield cutterhead.
引用
收藏
页数:14
相关论文
共 33 条
[1]   Analysis of Tunneling-Induced Ground Movements Using Transparent Soil Models [J].
Ahmed, Mahmoud ;
Iskander, Magued .
JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2011, 137 (05) :525-535
[2]  
Atkinson J.H., 1977, PROC ASCE GEOTECH EN, V103, P307, DOI 10.1061/AJGEB6.0000402
[3]  
Attewell P.B., 1982, GROUND ENG, V15, P13
[4]   Face failure in homogeneous and stratified soft ground: Theoretical and experimental approaches on 1g EPBS reduced scale model [J].
Berthoz, Nicolas ;
Branque, Denis ;
Subrin, Didier ;
Wong, Henry ;
Humbert, Emmanuel .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2012, 30 :25-37
[5]  
Bolton MD, 1996, GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, P471
[6]   Use of a two-dimensional discrete-element line-sink model to gain insight into tunnelling-induced deformations [J].
Bym, T. ;
Marketos, G. ;
Burland, J. B. ;
O'Sullivan, C. .
GEOTECHNIQUE, 2013, 63 (09) :791-795
[7]   SHALLOW TUNNELS IN COHESIONLESS SOIL - STABILITY OF TUNNEL FACE [J].
CHAMBON, P ;
CORTE, JF .
JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1994, 120 (07) :1148-1165
[8]   Face stability analysis of shallow shield tunnels in dry sandy ground using the discrete element method [J].
Chen, R. P. ;
Tang, L. J. ;
Ling, D. S. ;
Chen, Y. M. .
COMPUTERS AND GEOTECHNICS, 2011, 38 (02) :187-195
[9]   Experimental study on face instability of shield tunnel in sand [J].
Chen, Ren-peng ;
Li, Jun ;
Kong, Ling-gang ;
Tang, Lv-jun .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2013, 33 :12-21
[10]  
Cording E.J., 1991, P 9 PAN AM C, P2195