Structural engineering in dismantling of concrete bridges

被引:11
作者
Schacht, Gregor [1 ]
Mueller, Lukas [1 ]
Kromminga, Sven [1 ]
Krontal, Ludolf [1 ]
Marx, Steffen [2 ]
机构
[1] Marx Krontal GmbH, Uhlemeyerstr 9 11, D-30175 Hannover, Germany
[2] Leibniz Univ Hannover, Inst Massivbau, Appelstr 9A, D-30167 Hannover, Germany
关键词
dismantling; pre-stressed concrete bridges; subsequent re-anchorage; partial safety factor; movable scaffolding system;
D O I
10.1002/bate.201700093
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The deconstruction of viaducts in constricted valleys or in immediate vicinity of superstructures under traffic requires new engineer concept for the dismantling. Analog to new bridges the structural stability has to be proven for all states of deconstruction. This results in new challenges for civil engineers with innovative approaches and combined proofs with numerical and experimental investigations.
引用
收藏
页码:6 / 15
页数:10
相关论文
共 19 条
[1]  
[Anonymous], 199114 DIN EN
[2]  
[Anonymous], 1990201012 DIN EN
[3]  
[Anonymous], 180072000 DIN
[4]  
Bay H., 1968, BRUCKEN STAHLBETON S, V2
[5]  
Bundesministerium fur Verkehr, 2011, RICHTL NACHR STRA EN
[6]  
Dabritz M., 2018, BAUTECHNIK, V95
[7]  
Deinhard J. M., 1982, SPANNBETONBAU BUNDES, P110
[8]  
Finsterwalder U., 1952, BAUINGENIEUR-GERMANY, V27, P141
[9]   Subsequent anchorage of transverse prestressing cables clamping devices to rebuild Deelboge Bridge [J].
Fust, Christina ;
Wolff, Maren ;
Mark, Peter ;
Borowski, Michael .
BETON- UND STAHLBETONBAU, 2012, 107 (03) :136-145
[10]  
Hoyer E., 1939, STAHLSAITENBETON THE