共 36 条
- [1] Joint job/tool scheduling in a flexible manufacturing cell with no on-board tool magazine [J]. COMPUTER INTEGRATED MANUFACTURING SYSTEMS, 1997, 10 (01): : 61 - 68
- [2] [Anonymous], ROBOTICS COMPUTER IN
- [3] [Anonymous], 2008, TENCON 2008 2008 IEE, DOI DOI 10.1109/TENCON.2008.4766498
- [4] Baker K. R., 1974, Introduction to Sequencing and Scheduling"
- [5] Chryssolouris G., 1992, International Journal of Flexible Manufacturing Systems, V4, P309, DOI 10.1007/BF01324885
- [6] Chryssolouris G., 1994, International Journal of Flexible Manufacturing Systems, V6, P235, DOI 10.1007/BF01328813
- [7] ON THE RESOURCES ALLOCATION PROBLEM [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (12) : 2773 - 2795
- [9] An Artificial Immune System Based Multi-Agent Model and its Application to Robot Cooperation Problem [J]. 2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3033 - +