Optimisation of the construction and demolition waste management facilities location in Cantabria (Spain) under economical and environmental criteria

被引:27
作者
Galan, Berta [1 ]
Dosal, Elena [1 ]
Andres, Ana [1 ]
Viguri, Javier [1 ]
机构
[1] Univ Cantabria, Dept Chem Engn & Inorgan Chem, E-39005 Santander, Spain
关键词
Construction and demolition waste; Recycling network; Waste management; Total costs minimization; Transport distance minimization; MODEL; FEASIBILITY; SYSTEMS; NETWORK; SITES; WEEE; TOOL;
D O I
10.1007/s12649-013-9196-0
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Construction and demolition waste (C&DW) constitutes a priority waste stream due to the large amounts generated and its high potential for reuse and recycling. Specific legislation has been developed for this type of waste at European, national and regional level. In order to fulfill this new legislation, it is necessary to settle down a network of recycling facilities for C&DW (processing plants (PP) and/or transfer stations (TS)). The aim of this paper is to identify the locations and capacity of the transfer stations and processing plants and the corresponding distribution network by means of an optimization model that minimizes: (1) medium transportation distance and (2) total costs (installation, operation and landfill). The model is formulated as Mixed Integer Lineal Programming (MILP) problem where the binary variables represent the presence or not of management facilities at a location. General Algebraic Modeling System (GAMS) is used as a modeling system for the resolution of the mathematical programs. The model has been applied to a real-life case in Cantabria, a northern Spanish region. Two approaches have been considered: (a) the region as a whole area and (b) the region divided in five geographical areas. The results show that when the total costs are minimized, the number of facilities decreases, and when the medium transport distance is minimized, the number of facilities increases. The proposed final network includes location of three PP and two TS, each one of these facilities located in one of the five geographical areas defined. The optimal results also determine the municipality where each facility must be located, the capacity of them and the distribution network.
引用
收藏
页码:797 / 808
页数:12
相关论文
共 33 条
[1]   Capacity planning for electronic waste management facilities under uncertainty: multi-objective multi-time-step model development [J].
Ahluwalia, Poonam Khanijo ;
Nema, Arvind K. .
WASTE MANAGEMENT & RESEARCH, 2011, 29 (07) :694-709
[2]  
[Anonymous], 2012, MICHELIN ROUTE PLANN
[3]   Assessing multiple criteria for the optimal location of a construction and demolition waste management facility [J].
Banias, Georgios ;
Achillas, Charisios ;
Vlachokostas, Christos ;
Moussiopoulos, Nicolas ;
Tarsenis, Sokratis .
BUILDING AND ENVIRONMENT, 2010, 45 (10) :2317-2326
[4]   A benefit-cost analysis on the economic feasibility of construction waste minimisation: The case of Malaysia [J].
Begum, Rawshan Ara ;
Siwar, Chamhuri ;
Pereira, Joy Jacqueline ;
Jaafar, Abdul Hamid .
RESOURCES CONSERVATION AND RECYCLING, 2006, 48 (01) :86-98
[5]   Resources and waste management in Turin (Italy): the role of recycled aggregates in the sustainable supply mix [J].
Blengini, Gian Andrea ;
Garbarino, Elena .
JOURNAL OF CLEANER PRODUCTION, 2010, 18 (10-11) :1021-1030
[6]  
BOC: Boletin Oficial de Cantabria (BOC)/ Official Gazette of Cantabria. Decree 15/ 2010, 2010, BOC, V66, P12005
[7]  
BOC: Boletin Oficial de Cantabria (BOC)/ Official Gazette of Cantabria. Decree 72/ 2010, 2010, BOC, V214, P37087
[8]   Modeling the use of transportation energy for recycling construction steel [J].
Chong, Wai Kiong ;
Hermreck, Christopher .
CLEAN TECHNOLOGIES AND ENVIRONMENTAL POLICY, 2011, 13 (02) :317-330
[9]  
Coelho A., 2012, J CLEAN PROD
[10]   Economic viability analysis of a construction and demolition waste recycling plant in Portugal - part II: economic sensitivity analysis [J].
Coelho, Andre ;
de Brito, Jorge .
JOURNAL OF CLEANER PRODUCTION, 2013, 39 :329-337