Research on the Scheduling Problem of Urban Bus Crew Based on Impartiality

被引:3
作者
Chen, Mingming [1 ]
Niu, Huimin [1 ]
机构
[1] Lanzhou Jiaotong Univ, Sch Traff & Transportat, Lanzhou 730070, Peoples R China
来源
8TH INTERNATIONAL CONFERENCE ON TRAFFIC AND TRANSPORTATION STUDIES (ICTTS) | 2012年 / 43卷
关键词
urban transit; crew scheduling; trip; impartiality; tabu search algorithm;
D O I
10.1016/j.sbspro.2012.04.123
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
The scheduling problem of urban bus crew is an important part of the intelligent dispatching system in public transit. This paper considers impartiality constraint which is on the basis of assurance to meet the time shift of trips and work intensity for the crew, and establishes a crew scheduling model with the objective of minimizing the total idle time. A heuristic procedure using tabu search algorithm is also presented. A new heuristic algorithm with meeting the time shift of trips and work intensity constraints is designed to generate the initial solution and a neighborhood search method with trips exchange and insert strategy based on the ordered sequence is presented. The result shows that the method proposed in this paper can effectively overcome the disadvantage which the total working time of a day for the crew vary significantly, it can thus serve as a useful tool for public transit management department with more reasonable and pertinent assistant decision support. (C) 2012 Published by Elsevier B.V. Selection and/or peer review under responsibility of Beijing Jiaotong University [BJU], Systems Engineering Society of China (SESC)
引用
收藏
页码:503 / 511
页数:9
相关论文
共 10 条
[1]   A tree search algorithm for the crew scheduling problem [J].
Beasley, JE ;
Cao, B .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 94 (03) :517-526
[2]  
Ceder Avishai, 2007, PUBLIC TRANSIT PLANN
[3]  
CLEMENT R, 1995, LECT NOTES EC MATH S, V430, P213
[4]   A COLUMN GENERATION APPROACH TO THE URBAN TRANSIT CREW SCHEDULING PROBLEM [J].
DESROCHERS, M ;
SOUMIS, F .
TRANSPORTATION SCIENCE, 1989, 23 (01) :1-13
[5]   Multiple-depot integrated vehicle and crew scheduling [J].
Huisman, D ;
Freling, R ;
Wagelmans, APM .
TRANSPORTATION SCIENCE, 2005, 39 (04) :491-502
[6]   Multiobjective metaheuristics for the bus-driver scheduling problem [J].
Lourenço, HR ;
Paixao, JP ;
Portugal, R .
TRANSPORTATION SCIENCE, 2001, 35 (03) :331-343
[7]  
Shen Yindong, 2008, Journal of Huazhong University of Science and Technology, V36, P31
[8]   A BUS CREW SCHEDULING SYSTEM USING A SET COVERING FORMULATION [J].
SMITH, BM ;
WREN, A .
TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 1988, 22 (02) :97-108
[9]  
Wang H. X., 2006, J BEIJING U POSTS TE, V29, P30
[10]  
Yang Yingjun, 2010, Journal of Highway and Transportation Research and Development, V27, P142