An earned value model with risk analysis for project management under uncertain conditions

被引:37
作者
Moradi, Navid [1 ]
Mousavi, S. Meysam [1 ]
Vandani, Behnam [2 ]
机构
[1] Shahed Univ, Fac Engn, Dept Ind Engn, Tehran, Iran
[2] Islamic Azad Univ, Qazvin Branch, Fac Ind & Mech Engn, Qazvin, Iran
关键词
Earned value management; cost and schedule of projects; risk analysis; interval-valued triangular fuzzy numbers; CONSTRUCTION PROJECTS; FUZZY; SELECTION; COST; RANKING; VIKOR;
D O I
10.3233/JIFS-151139
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Earned value is a renowned project management technique that integrates the information on cost and schedule of projects to evaluate their current status. Despite the ability of earned value management (EVM) to measure and control the current status, it is not able to estimate the projects' future performances because EVM does not consider the changes in environmental circumstances or other elements that could influence on the future performance of the project. In the contrary with EVM, the risk analysis technique regards risky conditions for the future performance of the project by recognizing and analyzing the opportunities and threats. In this paper, a new evaluation model of the EVM blended with the risk analysis is presented to improve the project future performance forecasting. In addition, these indices and evaluations are defined under real-life uncertain conditions using linguistic variables represented by interval-valued triangular fuzzy numbers. Finally, a case study from the recent literature for construction industry is given in this paper to show the effectiveness of the proposed EVM model under uncertain conditions.
引用
收藏
页码:97 / 113
页数:17
相关论文
共 50 条
[41]   An estimation model of value-at-risk portfolio under uncertainty [J].
Yoshida, Yuji .
FUZZY SETS AND SYSTEMS, 2009, 160 (22) :3250-3262
[42]   The contribution of Earned Value Management to project success on contracted efforts: A quantitative statistics approach within the population of experienced practitioners [J].
Marshall, Robert A. .
Proceedings of IRNOP VII Project Research Conference, 2006, :739-751
[43]   Application of the Randomized Earned Value Method to assess the advancement of the construction of the office building under the unstable implementation conditions [J].
Kasprowicz, Tadeusz ;
Starczyk-Kolbyk, Anna .
ARCHIVES OF CIVIL ENGINEERING, 2024, 70 (01) :169-199
[44]   Optimization Study of Project Portfolio Selection Considering Resources Conversion Under Uncertain Conditions [J].
Liang Chang-yong ;
Wang Yong-sheng ;
Jiang Li-Ying .
PROCEEDINGS OF THE 4TH CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE AND SYSTEMS DYNAMICS, SSMSSD10, VOL 2, 2011, :263-268
[45]   Uncertain random portfolio optimization model with tail value-at-risk [J].
Li, Qiqi ;
Qin, Zhongfeng ;
Yan, Yingchen .
SOFT COMPUTING, 2022, 26 (18) :9385-9394
[46]   The Analysis of Project Risk Management Based on AHP [J].
Liu Hongyan .
2010 2ND IEEE INTERNATIONAL CONFERENCE ON INFORMATION AND FINANCIAL ENGINEERING (ICIFE), 2010, :576-579
[47]   Qualitative and quantitative project risk assessment using a hybrid PMBOK model developed under uncertainty conditions [J].
Barghi, Behrad ;
Sikari, Shahram Shadrokh .
HELIYON, 2020, 6 (01)
[48]   A cooperative advertising collaboration policy in supply chain management under uncertain conditions [J].
Sarkar, Biswajit ;
Omair, Muhammad ;
Kim, Namhun .
APPLIED SOFT COMPUTING, 2020, 88
[49]   Risk Analysis Model of Offshore Engineering Project Management Based on Fuzzy Membership Function [J].
Li, Wenxian .
JOURNAL OF COASTAL RESEARCH, 2019, :92-95
[50]   Computational decision analysis for flood risk management in an uncertain future [J].
Harvey, Hamish ;
Hall, Jim ;
Peppe, Roger .
JOURNAL OF HYDROINFORMATICS, 2012, 14 (03) :537-561