An earned value model with risk analysis for project management under uncertain conditions

被引:33
|
作者
Moradi, Navid [1 ]
Mousavi, S. Meysam [1 ]
Vandani, Behnam [2 ]
机构
[1] Shahed Univ, Fac Engn, Dept Ind Engn, Tehran, Iran
[2] Islamic Azad Univ, Qazvin Branch, Fac Ind & Mech Engn, Qazvin, Iran
关键词
Earned value management; cost and schedule of projects; risk analysis; interval-valued triangular fuzzy numbers; CONSTRUCTION PROJECTS; FUZZY; SELECTION; COST; RANKING; VIKOR;
D O I
10.3233/JIFS-151139
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Earned value is a renowned project management technique that integrates the information on cost and schedule of projects to evaluate their current status. Despite the ability of earned value management (EVM) to measure and control the current status, it is not able to estimate the projects' future performances because EVM does not consider the changes in environmental circumstances or other elements that could influence on the future performance of the project. In the contrary with EVM, the risk analysis technique regards risky conditions for the future performance of the project by recognizing and analyzing the opportunities and threats. In this paper, a new evaluation model of the EVM blended with the risk analysis is presented to improve the project future performance forecasting. In addition, these indices and evaluations are defined under real-life uncertain conditions using linguistic variables represented by interval-valued triangular fuzzy numbers. Finally, a case study from the recent literature for construction industry is given in this paper to show the effectiveness of the proposed EVM model under uncertain conditions.
引用
收藏
页码:97 / 113
页数:17
相关论文
共 50 条
  • [1] Sustainability assessment in construction projects: a sustainable earned value management model under uncertain and unreliable conditions
    Anbari Moghadam M.
    Bagherpour M.
    Ghannadpour S.F.
    Environment Systems and Decisions, 2024, 44 (1) : 45 - 68
  • [2] Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control
    Song, Jie
    Martens, Annelies
    Vanhoucke, Mario
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 297 (02) : 451 - 466
  • [3] Earned Green Value management for project management: A systematic review
    Koke, Benjamin
    Moehler, Robert C.
    JOURNAL OF CLEANER PRODUCTION, 2019, 230 : 180 - 197
  • [4] Combination of Project Cost Forecasts in Earned Value Management
    Kim, Byung-Cheol
    Reinschmidt, Kenneth F.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (11): : 958 - 966
  • [5] Earned value management in project time control
    Vakhrushkina A.V.
    Mishakova A.V.
    Borshcheva K.D.
    Magazine of Civil Engineering, 2017, 71 (03): : 30 - 38
  • [6] Classification of articles and journals on project control and earned value management
    Willems, Laura L.
    Vanhoucke, Mario
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2015, 33 (07) : 1610 - 1634
  • [7] Project Performance Analysis using Earned Value Management Method in Telecommunication
    Widiningrum, Adelia
    Pratami, Devi
    Haryono, Imam
    INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2020, 12 (03): : 107 - 114
  • [8] Research on applications of the earned value management in the project cost management
    An, Yuhua
    Liu, Liqun
    Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 973 - 978
  • [9] An Interval Type-2 Fuzzy Model for Project-earned Value Analysis Under Uncertainty
    Moradi, Navid
    Mousavi, S. Meysam
    Vahdani, Behnam
    JOURNAL OF MULTIPLE-VALUED LOGIC AND SOFT COMPUTING, 2018, 30 (01) : 79 - 103
  • [10] Stochastic Earned Duration Analysis for Project Schedule Management
    Acebes, Fernando
    Poza, David
    Gonzalez-Varona, Jose Manuel
    Lopez-Paredes, Adolfo
    ENGINEERING, 2022, 9 : 148 - 161