共 50 条
- [42] A new task scheduling algorithm using dynamic prediction adjustment and task flow shaping for grid computing DCABES 2007 Proceedings, Vols I and II, 2007, : 470 - 473
- [43] RCPL: A new task scheduling algorithm by Reduction of Critical Path Length in Grid Computing MECHANICAL, INDUSTRIAL, AND MANUFACTURING ENGINEERING, 2011, : 525 - 528
- [44] Dynamic level task scheduling algorithm based on risk estimation model in grid computing PROCEEDINGS OF THE THIRD CHINAGRID ANNUAL CONFERENCE, 2008, : 101 - 108
- [46] A price-based Task Scheduling for Grid Computing ICN 2008: SEVENTH INTERNATIONAL CONFERENCE ON NETWORKING, PROCEEDINGS, 2008, : 762 - 766
- [47] CPOC: Effective static task scheduling for grid computing HIGH PERFORMANCE COMPUTING AND COMMUNICATIONS, PROCEEDINGS, 2005, 3726 : 477 - 486
- [48] Task scheduling algorithm for Optical Grid architecture NETWORK ARCHITECTURES, MANAGEMENT, AND APPLICATIONS IV, 2006, 6354
- [49] Research on task scheduling algorithm in grid environment ICIC Express Letters, 2010, 4 (01): : 1 - 6