Commissioning of the PLS-II

被引:40
作者
Shin, S. [1 ]
Kwon, S. [1 ]
Kim, D-T. [1 ]
Kim, D-E. [1 ]
Kim, M. [1 ]
Kim, S-H. [1 ]
Kim, S-C. [1 ]
Kim, J. [1 ]
Kim, C. [1 ]
Park, B. [1 ]
Park, S-S. [1 ]
Park, S-J. [1 ]
Park, E. [1 ]
Son, Y. [1 ]
Yoon, J. [1 ]
Lee, B. [1 ]
Lee, E. [1 ]
Lee, J-W. [1 ]
Lee, H-S. [1 ]
Joo, Y. [1 ]
Choi, J. [1 ]
Ha, T. [1 ]
Hwang, W. [1 ]
Hwang, I. [1 ]
Lee, J-Y. [1 ]
Oh, B. [1 ]
Lee, C-H. [1 ]
Lee, H-S. [1 ]
Kim, J-Y. [1 ]
Hwang, J. Y. [1 ]
Nam, S. H. [1 ]
Cho, M. [1 ]
机构
[1] Pohang Inst Sci & Technol, Pohang Accelerator Lab, Pohang 790784, Kyungbuk, South Korea
来源
JOURNAL OF INSTRUMENTATION | 2013年 / 8卷
关键词
Instrumentation for particle accelerators and storage rings - low energy (linear accelerators; cyclotrons; electrostatic accelerators); Accelerator Subsystems and Technologies;
D O I
10.1088/1748-0221/8/01/P01019
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
After 14 years of successful operation, the Pohang Light Source (PLS) has completed PLS-II upgrade to meet the increasing demand from the growing user community. The PLS-II upgrade has increased the beam energy from 2.5 GeV to 3 GeV; the number of insertion devices has been increased by a factor of two (20 IDs); and the beam current has been increased to 400 mA from 200 mA. The beam emittance has been reduced to below 10 nm while retaining the existing PLS tunnel as well as the existing injection system. During the six months of commissioning in the latter half of 2011, we have successfully achieved 14 insertion device operations and top-up operations with 100 mA beam current and 5.8 nm beam emittance. In this paper, we report the experimental results obtained from the PLS-II commissioning.