Operation and Configuration Optimization of A CCHP System for General Building Load

被引:0
作者
Chang, Liuchen [1 ,2 ]
Weng, Gongyu [1 ]
Hu, Jie [1 ]
Mao, Meiqin [1 ]
机构
[1] Hefei Univ Technol, Res Ctr Photovolta Syst Engn, Hefei, Peoples R China
[2] Univ New Brunswick Fredericton, Dept Elect & Comp Engn, Fredericton, NB E3B 5A3, Canada
来源
2016 IEEE 8TH INTERNATIONAL POWER ELECTRONICS AND MOTION CONTROL CONFERENCE (IPEMC-ECCE ASIA) | 2016年
关键词
combined cooling; heating and power (CCHP) system; operation strategies; optimal operation condition; economic benefits;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Currently, the analysis of cooling, heating and power (CCHP) system is usually based on operation strategy (such as following the electric load) and optimization criterion (such as operation cost reduction) without considering the match between sources and loads distributions from the perspective of the allocation proportion of waste heat between cooling and heating units. And this issue is taken into consideration in this paper. An objective function of minimum cost is proposed, along with constrains of the capacity and parameters of the CCHP system, including four different operation strategies. This optimization model is then used to optimize the configuration along with operation strategies for specific load profiles. The proposed method is tested by the developing CCHP simulation platform under Labview environment, in which the detail model of micro-turbine, waste heat boiler and absorption chiller is included. Simulation results show that the cost of the hotel building are reduced by 30% to 40% if equipped with the optimized CCHP system.
引用
收藏
页数:7
相关论文
共 15 条
[1]  
[Anonymous], [No title captured]
[2]  
HU Dapeng, 2010, APPL REFRIGERATING T
[3]  
HUANG Jin-tao, 2005, J SHENYANG I ENG, P17
[4]  
[李赟 Li Yun], 2006, [动力工程, Power engineering], V26, P894
[5]  
Liu Jun, 2010, Automation of Electric Power Systems, V34, P85
[6]  
LIU Yalun, 2005, STUDY SIMULATION COM
[7]   Analysis and optimization of CCHP systems based on energy, economical, and environmental considerations [J].
Mago, P. J. ;
Chamra, L. M. .
ENERGY AND BUILDINGS, 2009, 41 (10) :1099-1106
[8]  
PENG Ke, 2009, RES MODELING SIMULAT
[9]   SIMPLIFIED MATHEMATICAL REPRESENTATIONS OF HEAVY-DUTY GAS-TURBINES [J].
ROWEN, WI .
JOURNAL OF ENGINEERING FOR POWER-TRANSACTIONS OF THE ASME, 1983, 105 (04) :865-869
[10]  
[王磊 Wang Lei], 2003, [东华大学学报. 自然科学版, Journal of Donghua University.Natural Science Edition], V29, P6