Scheduling airline reserve crew using a probabilistic crew absence and recovery model

被引:11
作者
Bayliss, Christopher [1 ]
De Maere, Geert [2 ]
Atkin, Jason A. D. [2 ]
Paelinck, Marc [3 ]
机构
[1] Univ Oberta Catalunya, Comp Sci Dept IN3, Av Carl Friedrich Gauss 5, Barcelona 08860, Spain
[2] Univ Nottingham, Sch Comp Sci, Nottingham, England
[3] ITCDOR, KLM Royal Dutch Airlines, KLM Headquarters, Amstelveen, Netherlands
基金
英国工程与自然科学研究理事会;
关键词
Airline scheduling; reserve crew; crew absence; uncertainty; probabilistic model; DECISION-SUPPORT; AIRCRAFT; OPTIMIZATION; ALGORITHM; ROBUST;
D O I
10.1080/01605682.2019.1567649
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Airlines require reserve crew to replace delayed or absent crew, with the aim of preventing consequent flight cancellations. A reserve crew schedule specifies the duty periods for which different reserve crew will be on standby to replace any absent crew. Due to dependencies between flights the timing of a duty period of a reserve crew member influences the probabilities of flight cancellations and also the probabilities that other reserve crew are required to replace absent. These interactions make the exercise of scheduling reserve crew duties a combinatorial optimisation problem. This work develops an enhanced mathematical model for assessing the impact of any given reserve crew schedule, in terms of expected cancellations and reserve induced delays. The proposed model produces results that match a simulation model, in a much shorter time. The model is then used as a fitness function in metaheuristic algorithms and the results are analysed in detail.
引用
收藏
页码:543 / 565
页数:23
相关论文
共 35 条
[1]   A Proactive crew recovery decision support tool for commercial airlines during irregular operations [J].
Abdelghany, A ;
Ekollu, G ;
Narasimhan, R ;
Abdelghany, K .
ANNALS OF OPERATIONS RESEARCH, 2004, 127 (1-4) :309-331
[2]   Airline planning benchmark problems-Part I: Characterising networks and demand using limited data [J].
Akartunali, Kerem ;
Boland, Natashia ;
Evans, Ian ;
Wallace, Mark ;
Waterer, Hamish .
COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (03) :775-792
[3]  
Amita J., 2015, INT J TRAFFIC TRANSP, V5, P410, DOI DOI 10.7708/IJTTE.2015.5(4).06
[4]  
[Anonymous], 2005, RECENT ADV MEMETIC A
[5]  
Barnhart C., 2003, Handbook of Transportation Science, P517, DOI DOI 10.1007/978-1-4615-5203-1
[6]  
Bayliss C., 2012, 12 WORKSH ALG APPR T, V25, P132
[7]  
Bayliss C, 2015, THESIS
[8]  
Bayliss C., 2015, TEST INSTANCE DATA S
[9]   Scheduling Airline Reserve Crew to Minimise Crew Related Delay using Simulated Airline Recovery and a Probabilistic Optimisation Model [J].
Bayliss, Chris ;
De Maere, Geert ;
Atkin, Jason ;
Paelinck, Marc .
2013 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC 2013), 2013, :1944-1950
[10]   A simulation scenario based mixed integer programming approach to airline reserve crew scheduling under uncertainty [J].
Bayliss, Christopher ;
De Maere, Geert ;
Atkin, Jason A. D. ;
Paelinck, Marc .
ANNALS OF OPERATIONS RESEARCH, 2017, 252 (02) :335-363